My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06208
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:45 PM
Creation date
10/12/2006 1:30:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/30/1986
Title
Overview of the Proposed STEP Process Development Plan
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Produce the documentation required to obtain the <br />remainder of the financine required for a full scale <br />production facility by financial institutions and <br />private investors. Basis of financine would be <br />eovernment aereement to pay unit cost per ton of <br />salt removal durine commercial facility operation. <br /> <br />. <br /> <br />m <br /> <br />.-< <br /> <br />G~ <br />.~ J <br />(~:) <br />C".:' <br /> <br />Purpose: <br /> <br />. <br /> <br />Phase IV - Desien, construction, and operation of a full scale <br />production facility located at Palisade, Colorado <br />for Glenwood Sprines saline water. <br /> <br />Purposes: <br /> <br />Provide a cost-effective method of reducine the <br />salinity of the water in the Colorado River. <br /> <br />Provide a beneficial use of the water, <br /> <br />Privatize the salt removal facility and associated <br />industrial facilities. <br /> <br />Increase the economic base in the project area. <br /> <br />The estimated schedule <br />as follows: <br /> Phase <br /> Phase I <br /> Phase II <br /> Phase III <br /> Phase IV <br /> <br />and costs for this development plan are <br /> <br />Duration <br /> <br />Cost <br /> <br />4 months <br /> <br />$200,000 <br /> <br />2 years <br /> <br />$1 ,800.000 <br /> <br />1 year <br /> <br />$1 ,500,000 <br />$135,000,000 <br /> <br />1.5 years <br /> <br />This work will be accomplished under the terms of the <br />cooperative agreement set-up between the U,S, Bureau of <br />Reclamation and WESTRANS, involving IBR, Denver Engineering <br />Corporation, and several universities, with support from the <br />Salinity Control Porum, USDA, USBR, and the State of Colorado. <br /> <br />PHASE I FEASIBILITY STUDY <br /> <br />The following provides s more <br />Phase I, including statement <br />schedule, cost estimate, <br />application, <br /> <br />detailed description of plans for <br />of work, task description, task <br />deliverables, and resources <br /> <br />Statement of Work: <br /> <br />Provide <br />removal <br /> <br />a technical and economic feasibility analysis of a salt <br />demonstration facility at Palisade, Colorado, The <br />
The URL can be used to link to this page
Your browser does not support the video tag.