Laserfiche WebLink
<br />0") <br /> <br />.-. <br />c-: <br /> <br />. <br /> <br />. <br /> <br />contribution to the econoaic base of the Glenwood Canyon - Grand <br />Junction Valley area. <br /> <br />c.~~' <br /> <br />.~ <br />....-. <br /> <br />Transition froa the conceptual feasibility stage to a profitable <br />private enterprise that is cost effective and in the belt <br />interest of the public sector will require the execution of an <br />orderly developaent plant to assure the following: <br /> <br />o The systea will operate and produce in accordance with <br />defined paraaeters, <br /> <br />o Financial risks are at a ainiaua. <br /> <br />o <br /> <br />Investorl can <br />investllent. <br /> <br />realize <br /> <br />acceptable <br /> <br />return <br /> <br />on <br /> <br />an <br /> <br />o All local. state and federal regulations are adhered to. <br /> <br />A four phase long range developaent plan is proposed: <br /> <br />Phase I <br /> <br />Purpose: <br /> <br />Phase II - <br /> <br />Purposes: <br /> <br />Phase III <br /> <br />Technical and econollic feasibility analysis <br />Glenwood Springs saline water beneficial use <br />salt relloval deaonstration faciIity located <br />Palisade. Colorado, <br /> <br />of a <br />and <br />at <br /> <br />Produce docullentation required to obtain private <br />financing for construction and operation of a <br />dellonstration facility. Basis of financing would be <br />private investaent backed by a governaent guarantee <br />to reillburse in case of deaonstration failure: no <br />repayaent is required if successful. <br /> <br />and <br />water <br />located <br /> <br />operation of a <br />sa It reaova 1 <br />at Palisade, <br /> <br />Detail design, construction, <br />Glenwood Springs saline <br />dellonstration facility <br />Colorado, <br /> <br />Provide conclusive evidence that the production of <br />salt tolerant plants is a beneficial use of saline <br />water in the project area. <br /> <br />Quantify the <br />evaporation <br />project area. <br /> <br />efficiency <br />and final <br /> <br />cost of spray <br />ponds in the <br /> <br />and un it <br />evaporation <br /> <br />Establish design criteria and cost data for <br />construction and operation of production systea. <br /> <br />cost estillate for a full <br />removal facility located at <br />for Glenwood Springs saline <br /> <br />Prelillinary design and <br />scale production salt <br />Palisade, Colorado <br />water. <br />