My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06093
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:21:14 PM
Creation date
10/12/2006 1:25:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543.200
Description
Projects in the Closed Basin
State
CO
Basin
Rio Grande
Water Division
3
Date
3/1/1989
Title
Closed Basin Division Operating Criteria
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Division. The project will be operated and maintained initially by Reclamation <br />personnel. (Agreement included in Appendix A) <br /> <br />The Closed Basin Division is, technically, a very complex project to <br />operate, control and keep within the legislative constraints. Different plans <br /> <br />will be developed as the RGWCD is assimilated into the operations and main- <br /> <br />tenance of the project. The cooperative agreement describes work schedules <br />which provide for changing levels of involvement in Closed Basin Division opera- <br /> <br />tions and maintenance. <br /> <br />Tne project operation will be performed by the PMSC system and monitored by <br /> <br />operators within the parameters establ ished by authorizing legislation and this <br /> <br />document. A ground water hydrologist will review and analyze the data from the <br /> <br />observation well network and provide recommendations to the operators for opera- <br /> <br />tion in compliance with the authorizing legislation. The Water Quality <br /> <br />Laboratory staff will collect samples and test for compliance with the Rio <br /> <br /> <br />Grande Compact and Colorado Water Quality Standards. The project chemist will <br /> <br />make recommendations for operation in compliance with water quality regulations. <br /> <br /> <br />The water accounting for project facilities and the ground water hydrology work <br /> <br />will be performed by the Albuquerque Projects office (ALB) in Albuquerque, <br /> <br />New ~exico. <br /> <br />A. ~aintenance <br /> <br />The maintenance of the Closed Basin Division is categorized into Civil <br />Maintenance and Electrical/Mechanical Maintenance. <br /> <br />The Civil Maintenance is composed of canals, pipelines, roads, etc., and <br /> <br />will initially be performed by Reclamation using equipment purchased for the <br /> <br />project. The canal was designed for and will be operated year round. Most of <br /> <br />10 <br /> <br />\r .. ,--'"" / /. 1"'\ <br />J;" h.J ~ J. ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.