Laserfiche WebLink
<br />::':'..::<f~;~ <br />.,,_..'...'. <br />""",',:--; <br />t:-/,.';C <br /> <br />",' <br /> <br />", <br /> <br />" <br />, <br /> <br />-',,;,... <br /> <br />.-',': <br /> <br />':j <br /> <br />'.,"'/, <br />'. .' <br /> <br />." ..- <br />:".' <br /> <br />.. .. <br />, <br />:1" <br /> <br />..... <br /> <br />.. <br />" <br /> <br />...',; <br />'. .:' . <br />.' <br /> <br />" <br />... <br /> <br />" <br /> <br />'. .' <br /> <br />, :'. <br /> <br />. ~ ~ . <br /> <br />,.',' <br /> <br />, :.' ~ .': . , <br />...,...~:~:)~~?>~:(~:... . <br /> <br />000052 <br /> <br />TABLE 2-2 <br /> <br />RIPRAP GRADATION REQUIREMENTS <br /> <br />NOMINAL PERCENTAGE OF ROCK FRAGMENTS OF VARIOUS WEIGHTS' (POUNDS) <br />THICKNESS NOMINAL 40 TO 50 50 TO 60 o TO 10 <br />OF RIPRAP 'lAXlMUM PERCWT PERCENT PERCENT <br />INCHES SIZE3 GREATER THAN FROM TO LESS THAN <br />24 l,250 625 50 625 50 <br />36 1,,500 2,250 100 2,250 Ion <br /> <br />Sand and rock dust is less than 5 percent, by weight, of the <br />total riprap msterial. <br /> <br />2 <br /> <br />The percentalle of this-aize material does not exceed an amount <br />which will fill the voids in the larp;e rock. <br /> <br />3 <br /> <br />Rock fragments larp;er than the nominal size were permit ted, <br />provided that no larp;e unfilled void spaces were left adjscent <br />to or surrounding the oversize rock. <br /> <br />b. Concrete Dam. Approximately 530,000 cubic yards of <br />concrete wss used in the construction of the concrete massive head- <br />buttress of the Pueblo Dam. The structure is 1,750 feet lonll and <br />l38 feet wide at the base with 23 buttresses and is located between <br />stations 5l+78 and 69+28. The top of the psrapet is lQl feet above <br />the streambed at elevation 4925.0 feet ms!. The spillway and <br />outlet works are located in this portion of the Pueblo Dam, see <br />Plate 2-4. <br /> <br />c. Spillwsy. The spillway is uncontrolled and i~ <br />located between stations 57+03 and 62+53. The spillwav ia an <br />ogee weir with a lenllth of 550 feet and crest elevation of 48'l8.7 <br />feet, mill. The plan of the spillwav is shown on Plates 2-1 and <br />2-4. The spillway ratinR curve is .hown on Plste 2-~. <br /> <br />d. Outlet Works. The river, spillway, fish hatcherv, <br />and south outlet works sre located in the concrete massive h<,ao- <br />buttress, snd the Ilessemer Ditch outlet works is located in the <br />right embsnkment. The following is a description of the outlet <br />works; <br /> <br />(1) <br />consistin~ of one <br />l6, which is over <br /> <br />River Outlet Works. The river outlet works, <br />gsted conduit, is located in hut tress numher <br />the streambed. The length of the conduit is <br /> <br />2-2 <br /> <br />,?'~ <.';' <br /> <br />> ,;~~~;t1i~4> '--, <br /> <br />':: <br /> <br />',,' <br /> <br />,/ ". <br /> <br />,';)-5! <br />..,." <br />"'-'~ <br /> <br />2 <br /> <br />, I <br /> <br />,<','i <br /> <br />I <br />I <br />I <br />I <br /> <br />.';". ' <br /> <br />"::\;>\,\,,-:,,,:;,-,:.~. : <br />