My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05704
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:33 PM
Creation date
10/12/2006 1:12:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8460.400
Description
Platte River Basin-Platte River Basin Endangered Species Issues-Platte River Management Joint Study
Basin
South Platte
Water Division
1
Date
8/30/1991
Title
Management Alternative Work Group Status Report for Fiscal Year 1991-Draft 1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00083:i <br /> <br />. <br /> <br />. <br /> <br />toward land management options while it was evident more work was <br />needed to develop water management methods. <br /> <br />B. January - Marcb <br />It became apparent through redrafting of the above report that <br />additional effort would be required to develop the Block/Segment <br />Habitat Management Plan with both land and water management <br />methods. The Work Group laid out a systematic approach and <br />schedule to assimilate alternatives. Eight work tasks were <br />developed, including a time frame, that would lead to a <br />comprehensive Work Group Report identifying an endangered species <br />habitat management plan for the Platte River. These work tasks <br />include: <br /> <br />1) write and Edit Work Group Report <br />2) Define Habitat Units <br />3) Define Present Condition Habitat <br />4) Develop Land Management Methods <br />5) Develop Water Management Methods <br />6) Develop Alternatives <br />7) Compare Alternatives <br />8) Recommend Implementation Plan <br /> <br />A definition of each task, along with a schedule for completion, <br />was prepared by the Work Group and presented to the Coordinating <br />committee in March, 1991. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.