My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05666
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:22 PM
Creation date
10/12/2006 1:10:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1958
Author
Various
Title
Progress Statements July 1958 through December 1958
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />barrels of ocean water in the next five years. The expected recovery is <br />about 400,000,000 barrels of secondary oil. Another major objective is <br />to halt or minimize subsidence of the land surface. The unit agreements <br />are expected to be completed by early fall. <br /> <br />On April 21, 1959, Pan American Petroleum Company completed well <br />No.1 Navajo "C" in the NWk Sec. 1, T. 29 N., R. 17 W., with an initial <br />production of 9,000,000 cubic feet of gas and 109 barrels of 700 gravity <br />distillate per day from the Paradox formation. This discovery may provide <br />enough helium-bearing gas to reopen the Bureau of Mines helium plant at <br />Shiprock, New Mexico. <br /> <br />Kimball-Campbell Corporation is oompleting its new refinery about one <br />mile south of Bloomfield, New Mexico. Plans call for 95,000 barrels of <br />tank storage. <br /> <br />El Paso Natural Gas Company has completed a gas gathering system <br />which extends from its Kirtland plant in San Juan County, New Mexico, <br />to the Paradox Basin pools in southeastern Utah. <br /> <br />About 530 wells ,were started and about 400 wells were completed in <br />the "four-corners" area during January-May 1959. <br /> <br />Mineral LeasillS'- In Colorado, the AEC plans to set off a nuclear <br />explosion deep in the oil-shale formations of the Parachute Creek area, <br />Garfield County, to learn if the resulting heat and force offers an <br />economical and efficient method of breaking ground for mining or re- <br />leasing oil. Half the cost of the experiment is being solicited from <br />private industry. <br /> <br />Public Service Company of Colorado has started construction of a <br />44,000-kw coal-fired steam-electric unit adjoining its operating <br />22,500-kw unit at Cameo, Mesa County. <br /> <br />In coking qualities, coal mined during the past year in the newly <br />developed Coal Basin area, about 30 miles south of Glenwood Springs, <br />compares favorably with high-grade coals mined elsewhere in the United <br />States. Mid-Continent Coal & Coke Company, which operates in the area, <br />has doubled its production; most of the output goes to western steel <br />companies. <br /> <br />In Utah, owing to unseasonably. warm weather and the inroads of both <br />natural gas and oil, coal production in the first half of 1959 was 25 to <br />30 percent less than a year ago. <br /> <br />In Wyoming the recent sale of two sodium leases in the Trona area, <br />Sweetwater County, brought a record bid for the area--$13.13 per acre-- <br />by the Kern County Land Company of California. <br /> <br />In Arizona and New Mexico the Utah Construction Company is con- <br />tinuing to prospect by drilling on their coal lease on the Navajo Reser- <br />vation, and is negotiating a contract to furnish coal to a power plant <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.