My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05598
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:19:03 PM
Creation date
10/12/2006 1:08:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
7/1/1946
Author
Metro Water District
Title
Metropolitan Water District of Southern California - Eighth Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.,r' r, 'I <br />t..JV.J <br />:12 ,II F THO I' (I LIT ,I N 11'1 T E R 1I1 S T R leT <br /> <br />installed in order to obtain more accurate meter readings under <br />low flows but they are no longer necessary. Other items of work <br />done include repairs to brine pumps, brine meter, lime slaker <br />feeders, regenerator rinse controllers. and other minor equipment. <br />In order to permit the installation of 20.inch service connections <br />for the cities of Los Angeles and Pasadena in February 1946, it <br />was necessary to shut off the flow of water west of La Verne to drain <br />the sections of line adjacent to the connections. Water was shut <br />off at Lake Mathews at 9 :00 p,m, on February 13 and turned on <br />again at 10 :30 p.m. on February 14, This shutdown presented an <br />opportunity to inspect facilities at several ]Joints hetween Lake <br />Mathews and Santa Monica with a minimum interruption of <br />service and waste of water. Members of both the field and office <br />forces were organized into several inspection parties so that as <br />much line as possible could be inspected in the limited time avail- <br />able. The following facilities were inspected: the outlet tower. <br />tunnel, and head works at Lake Mathews; sections of enamel-lined <br />steel pipe at Pedley Hills and at Dufferin Avenue and Van Buren <br />Street; various features of the softening and filtration' plant which <br />are not accessible when in operation; the cast-in-place Monrovia <br />Canyon crossing; the Monrovia No.4 tunnel; the section of precast <br />concrete pipe between Sierra Madre tunnel and Eaton Wash: the <br /> <br /> <br />;. ".:' <br /> <br />_'. ~:-1;1":'-' '" I'I~ . HA,LF' SeCTION <br />, . STEEL RIB SUPPORT <br /> <br />Fig. 4. CT08~ sp-ctinn of distribut--io-n f--unnel <br />
The URL can be used to link to this page
Your browser does not support the video tag.