<br />METROPOLITAN WATER DISTRICT
<br />
<br />The net construction cost of the principal distribution system
<br />features for the present stage of development is given in table 5,
<br />
<br />TABLE 5
<br />
<br />DISTRIBUTION SYSTEM FEATURES
<br />June 30, 1946
<br />
<br />N.T
<br />CON~TftUCTlON
<br />COST
<br />S 2,643,302,25
<br />5,970,829,02
<br />
<br />FE.HUIlE
<br />
<br />Hight (,f ....a)', land.... and easement9....
<br />Cajalco dam, dike, anJ headworks.m...
<br />Pipe lines:
<br />Preca..,/ con('rt:'l~
<br />ConcTett' casl.in.place
<br />Ashestus cement
<br />WeIdell sled
<br />Cast.iron
<br />Tunnels
<br />Re!ler\'Oirs
<br />Softening tind filtralic,n plant
<br />~Iiscellaneuu~
<br />
<br />65.77 mi les
<br />0.31 mile
<br />2.44 miles
<br />72.53 miles
<br />10.13 miles
<br />16...J7 miles
<br />
<br />12,729,394.40
<br />381,507,24
<br />92,461.98
<br />]),725,142,89
<br />86-1.862,17
<br />6,7005,984.28
<br />7,501.490,21
<br />3.-\72,691.67
<br />259,284,04
<br />$52,346,950.15
<br />
<br />Total. .
<br />
<br />An average crew of 34 men exclusive of the softening plant
<br />forces, working under the direction of the District's chief opera-
<br />tion and maintenance engineer, carried on all operation, mainte-
<br />nance, and minor construction activities on the distribution system.
<br />No serious difficulties were encountered in operating and main-
<br />taining the pipe lines and reservoirs during this fifth year of oper-
<br />ation. Division foremen are located at Lake Mathews, Morris
<br />reservoir, Orange County reservoir, Palos Verdes reservoir, and
<br />on the Santa Monica feeder. These foremen, with the assistance
<br />of maintenance men and helpers, maintain the reservoirs, the
<br />upper feeder, the branch feeders, and the laterals, Normal main.
<br />tenance work includes systematic patrol, minor repairs, collection
<br />of water samples, and changing of meter charts at regular inter-
<br />\'als, Special and major maintenance and repair work is done by
<br />men under the mechanical foreman with headquarters at the soft-
<br />ening and filtration plant at La Verne.
<br />Several minor projects were handled by the maintenance crews
<br />in addition to their regular maintenance work. A new 16-inch
<br />diameter regulating valve was installed in the structure at the north
<br />portal of Hollywood tunnel. A new propeller wheel was installed
<br />in the inflow-outflow meter at Pulos Verdes reservoir. A badly
<br />cavitated 48 x 36-inch flood release needle valve at Morris Dam
<br />was replaced with a 30 x 24-inch needle valve, and two additional
<br />valves were overhauled. Vents were installed in various struc-
<br />
|