Laserfiche WebLink
<br />>, - r 1 <br />. ", .J <br />"wi ~ <br /> <br />30 <br /> <br />METROPOLITAN WATER DISTRICT <br /> <br />The net construction cost of the principal distribution system <br />features for the present stage of development is given in table 5, <br /> <br />TABLE 5 <br /> <br />DISTRIBUTION SYSTEM FEATURES <br />June 30, 1946 <br /> <br />N.T <br />CON~TftUCTlON <br />COST <br />S 2,643,302,25 <br />5,970,829,02 <br /> <br />FE.HUIlE <br /> <br />Hight (,f ....a)', land.... and easement9.... <br />Cajalco dam, dike, anJ headworks.m... <br />Pipe lines: <br />Preca..,/ con('rt:'l~ <br />ConcTett' casl.in.place <br />Ashestus cement <br />WeIdell sled <br />Cast.iron <br />Tunnels <br />Re!ler\'Oirs <br />Softening tind filtralic,n plant <br />~Iiscellaneuu~ <br /> <br />65.77 mi les <br />0.31 mile <br />2.44 miles <br />72.53 miles <br />10.13 miles <br />16...J7 miles <br /> <br />12,729,394.40 <br />381,507,24 <br />92,461.98 <br />]),725,142,89 <br />86-1.862,17 <br />6,7005,984.28 <br />7,501.490,21 <br />3.-\72,691.67 <br />259,284,04 <br />$52,346,950.15 <br /> <br />Total. . <br /> <br />An average crew of 34 men exclusive of the softening plant <br />forces, working under the direction of the District's chief opera- <br />tion and maintenance engineer, carried on all operation, mainte- <br />nance, and minor construction activities on the distribution system. <br />No serious difficulties were encountered in operating and main- <br />taining the pipe lines and reservoirs during this fifth year of oper- <br />ation. Division foremen are located at Lake Mathews, Morris <br />reservoir, Orange County reservoir, Palos Verdes reservoir, and <br />on the Santa Monica feeder. These foremen, with the assistance <br />of maintenance men and helpers, maintain the reservoirs, the <br />upper feeder, the branch feeders, and the laterals, Normal main. <br />tenance work includes systematic patrol, minor repairs, collection <br />of water samples, and changing of meter charts at regular inter- <br />\'als, Special and major maintenance and repair work is done by <br />men under the mechanical foreman with headquarters at the soft- <br />ening and filtration plant at La Verne. <br />Several minor projects were handled by the maintenance crews <br />in addition to their regular maintenance work. A new 16-inch <br />diameter regulating valve was installed in the structure at the north <br />portal of Hollywood tunnel. A new propeller wheel was installed <br />in the inflow-outflow meter at Pulos Verdes reservoir. A badly <br />cavitated 48 x 36-inch flood release needle valve at Morris Dam <br />was replaced with a 30 x 24-inch needle valve, and two additional <br />valves were overhauled. Vents were installed in various struc- <br />