Laserfiche WebLink
<br />I <br />I <br />r <br />I; <br />I <br />, <br /> <br />I" <br /> <br />" . (". <br />~'hi' <br /> <br />OPERATION ANIl MAINTENANCE <br /> <br />13 <br /> <br />.... j. <br /> <br />Additions and bettennents <br /> <br />The return of men from the armed services and the increasing <br />ratio of married men to single men at Gene camp caused a serious <br />housing shortage. To alleviate this situation the two 20-man <br />bunkhouses at Gene, formerly used during construction, were made <br />into four apartments, Work was started on moving two unoccu- <br />pied cottages from Eagle Mountain camp to Gene, <br />At the end of the fiscal year work had been started on the in- <br />stallation on the Boulder 230-kv line of a bank of stepdown trans. <br />formers to supply electric power for camp and residence service <br />at Camino switching station, Hitherto this camp has been sup- <br />plied with electric energy for lighting service only from two small <br />gasoline engine.driven generators, which required excessive main- <br />tenance and were of insufficient capacity. . <br /> <br />Bouldel" powel" <br /> <br />A new agreement as to the resale, generation and transmission <br />of District unused firm energy at Boulder Dam and the use of Dis. <br />trict energy from the Parker power plant was consummated during <br />the year and became effective as of June 1, 1945 running until <br />May 31, 1987, Tbis agreement is embodied in three contracts <br />known respectively as the District's 1945 Resale Contract, the <br />1945 Collateral Contract, and the District-Edison Transmission <br />Contract. <br />The District's 1945 Resale Contract, executed by the Secretary <br />of the Interior, the Reconstruction Finance Corporation, the City <br />of Los Angeles, the Southern California Edison Company, Lim. <br />ited, the California Electric Power Company, and the Metropolitan <br />W:lter-!5istric( provides thaC allenergy - withill the District's allot- <br />ment remaining unused by the District and not resold by previous <br />contracts will be taken and paid for 55 per cent by the City of Los <br />Angeles, 40 per cent by the Edison Company, and five per cent <br />by the California Electric Power Company. The rate to be paid <br />for the credit of the District is the rate for firm energy in effect <br />for the year the energy is taken, except that during the first five <br />years the following percentages of tbe firm rates will be paid: <br />first year, 40 per cent; second year, 50 per cent; third year, 65 <br />per cent; fourth year, 80 per cent; fifth year, 95 per cent. <br />The District agrees to operate its pumping system so as to leave <br />unused the maximum amount of Boulder energy, but retains the <br />right to use any part or all of its allotment as desired. During the <br />