Laserfiche WebLink
<br />c ; <br /> <br />" <br /> <br />Hi3S <br /> <br />Denver, Colorado <br /> <br />July 16, 19u9 <br /> <br />To: Steerin~ Committee, Blue-South Platte and Gunnison-Arkansas Projects, <br />Colorado <br />Policy and Review Committee, Initial Phase, Gunnison-Arkansas <br />Project, Colorado I <br /> <br />From: Engineering Advisory Committee <br /> <br />Subject: Stora~e capacity to be provided in Aspen Reservoir Site - Initial <br />Phase Gunnison-Arkansas Project, Colorado. <br /> <br />1. At the May 25, 19u9 meeting of the Policy and Review Committee, <br />an Engineering Advisory Committee was .appointed to review previous studies <br />to detennine the capacity that should be provided in the Aspen reservoir <br />on the Roaring Fork to Qeet the replacement needs of the Initial Phase <br />Gunnisol1-"rkMSlls Project and for ether purposes. The Comnittee (ylith <br />the exc,,~:,jon of Ur. F. C. l.;erriell) met in Denver, Colorado, on July U, 15u9, <br />and agn.iL V,.ith the exce!1tion of l~ro R. J. Tipton) on J'J.l)r 16, 19L90 l.:ro <br />Tiptor has been contacteu by nail of the results of the calculations and <br />has expressed his general concurrenCe therein. HO"lever, Hr. Tipton was not <br />present at the meeting "mere the recommendations were fonnulated. <br /> <br />2. The project contemplates the diversion of the followinr; o',an+.ities <br />of water from the Colorado River watershed to the Arkansas River Basin: <br /> <br />(a) The existing Independence Pass (Twin Lakes Canal and <br />Reservoir Compo.ny) Tunnel would increase its diversion to an <br />average of 52,800 acre-feet annually from the Roaring Fork above <br />Aspen. <br /> <br />(b) The Initial Phase Gumison-Arkansas Prociect would diyert <br />an averaGe of 55,000 ucre-feet annually from Fr~~ng Pan Creek und <br />Hunter Creek, tributaries of the RoarinG Fork between ;'spen Dnd <br />Glenwood Sprin(s. <br /> <br />J. ~uch of the water to be diverted by the transmotmtain diver3ions <br />de::;cribe~ in the rrecerling paragraph occurs in Doad r.!onths and is ~:;1)rFl ~lS <br />so flir as the ;>resent and prospective future uses in the Colorado River <br />wlitershed in C.olorado are concerned. Honever, part of the water !lronosed <br />to be diverted occurs in the low water season IlI1d would need be replaced <br />for uses in Western Colorado. The critical period for determination of <br />repluc,ement storace reo.uirements occurs betwe(m the 193u und the IS'3) flood <br />0811:..;00:3.. Tili:i Derioct "iU3 deterJ.!1ined from n study of the lO-vea.r dry r,:eriod <br />1S'31 to 1%0 ir~lusive, lOnrticulnr';r tJ1e dry sea~ons cf 1?3JJ:JS, lS'J7-Il'.J, <br />and 19uo-Ll. In the V-month period, June 19J4 to )"a;; lS'J5, inclusive, <br />the proposed d.i versions are estimated to be as [0110\.",5: <br />