My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05556
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:51 PM
Creation date
10/12/2006 1:07:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.600
Description
South Platte Projects - Chatfield Dam and Lake
State
CO
Basin
South Platte
Date
1/1/1967
Author
Black and Vetch
Title
Report on Chatfield Project for Board of Water Commissioners City and County of Denver
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />place undisturbed is considered due to the infrequent inundation <br />of a small section of the conduit, Since internal water pressure <br /> <br />would exceed external pressure, flood waters would not enter the <br /> <br /> <br />conduit, Infrequent flooding should have no deleterious effects. <br /> <br /> <br />The Corps has agreed to locate the new highway embankment to pre- <br /> <br /> <br />clude any adverse effect on Conduit 20 if left in place. <br /> <br /> <br />~. Relocation of Conduit 10 to the west as proposed by the Corps <br /> <br /> <br />except to run the conduit around Deer Creek Valley at elevation <br /> <br /> <br />5500; relocation of Conduit 10 to the west except to run the con- <br /> <br /> <br />duit across Deer Creek Valley in natural ground; or relocation of <br /> <br /> <br />Conduit 10 to the ea.st, including a section of Conduit 27, and <br /> <br /> <br />tying into Conduit 10 below Chatfield Dam. <br /> <br /> <br />Relocation of Conduit 10 around Deer Creek Valley will re- <br /> <br /> <br />move the conduit from any effects by the Chatfield Project. The <br /> <br /> <br />estimated cost of relocating Conduit 10 as a 48 inch line from <br /> <br /> <br />Kassler Plant to below Chatfield Dam under this alternative is <br /> <br /> <br />$2,756,000, including the clearwe11 and pumping station. Operation <br /> <br /> <br />and maintenance expenses for the Conduit 10 Pumping Station would <br /> <br /> <br />increase $2,200 to a total of $116,200 annually. <br /> <br /> <br />Relocation of Conduit 10 in natural ground across 'Deer Creek <br /> <br /> <br />Valley generally parallel to Conduit 20 is considered as an alter- <br /> <br /> <br />native because the conduit will be inundated very infrequently. <br /> <br /> <br />Estimated cost of the Conduit 10 as a 48 inch line, clearwell, and <br /> <br /> <br />pumping station is $2,375,000. Operation and maintenance expenses <br /> <br /> <br />would be the same as for the Corps plan, $114,000 annually. <br /> <br />" <br /> <br />- 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.