Laserfiche WebLink
<br />, <br /> <br />a. Protection or the Kassler Treatment Plant and Last Chance <br />Ditch Pumping Station by construction or a levee around the <br />plant, realignment or the South Platte River past the levee, <br />provisions ror passing Platte Canon River rlume through the <br />levee, and provisions ror disposal or storm water trapped be- <br /> <br /> <br />hind the levee. The Kassler Plant protective works have been <br /> <br /> <br />estimated to cost $781,000, including the storm water and <br /> <br /> <br />seepage water pumping station added in this study. <br /> <br /> <br />b. Relocation or Conduit 10 to the west rrom the Kassler <br /> <br /> <br />Plant around Chatrield Reservoir to tie into Conduit 10 be- <br /> <br /> <br />low Chatfield Dam. Construction of a clearwell and pumping <br /> <br /> <br />station to receive and pump the Kassler Plant effluent through <br /> <br /> <br />this relocated Conduit 10 is a part of the plan. Cost or a <br /> <br /> <br />48 inch conduit, 500,000 gallon clearwell, and a pumping <br /> <br /> <br />station with a firm capacity or 45 million gallons per day <br /> <br /> <br />has been estimated at $2,486,000. Operation and maintenance <br /> <br /> <br />expenses for the Conduit 10 Pumping Station have been estimated <br /> <br /> <br />at $114,000 annually ror a 48 inch replacement conduit. <br /> <br /> <br />~. Raising the prorile of Conduit 20 through Deer Creek <br /> <br /> <br />Valley by relocating the conduit in the fill embankment for <br /> <br /> <br />relocated Colorado Highway No. 75. Cost of this revision <br /> <br /> <br />has been estimated at $674,000. <br /> <br /> <br />d. Retaining the Infiltration Gallery in service by con- <br /> <br /> <br />struction of an access causeway from westerly high ground to <br /> <br /> <br />a new collection well and new pumping station. A new force <br /> <br /> <br />main will carry the treated water from the pumping station <br /> <br /> <br />to relocated Conduit 10. Estimated cost of the causeway, <br /> <br />^J <br /> <br />- 5 - <br />