My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05556
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:51 PM
Creation date
10/12/2006 1:07:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.600
Description
South Platte Projects - Chatfield Dam and Lake
State
CO
Basin
South Platte
Date
1/1/1967
Author
Black and Vetch
Title
Report on Chatfield Project for Board of Water Commissioners City and County of Denver
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />a. Protection or the Kassler Treatment Plant and Last Chance <br />Ditch Pumping Station by construction or a levee around the <br />plant, realignment or the South Platte River past the levee, <br />provisions ror passing Platte Canon River rlume through the <br />levee, and provisions ror disposal or storm water trapped be- <br /> <br /> <br />hind the levee. The Kassler Plant protective works have been <br /> <br /> <br />estimated to cost $781,000, including the storm water and <br /> <br /> <br />seepage water pumping station added in this study. <br /> <br /> <br />b. Relocation or Conduit 10 to the west rrom the Kassler <br /> <br /> <br />Plant around Chatrield Reservoir to tie into Conduit 10 be- <br /> <br /> <br />low Chatfield Dam. Construction of a clearwell and pumping <br /> <br /> <br />station to receive and pump the Kassler Plant effluent through <br /> <br /> <br />this relocated Conduit 10 is a part of the plan. Cost or a <br /> <br /> <br />48 inch conduit, 500,000 gallon clearwell, and a pumping <br /> <br /> <br />station with a firm capacity or 45 million gallons per day <br /> <br /> <br />has been estimated at $2,486,000. Operation and maintenance <br /> <br /> <br />expenses for the Conduit 10 Pumping Station have been estimated <br /> <br /> <br />at $114,000 annually ror a 48 inch replacement conduit. <br /> <br /> <br />~. Raising the prorile of Conduit 20 through Deer Creek <br /> <br /> <br />Valley by relocating the conduit in the fill embankment for <br /> <br /> <br />relocated Colorado Highway No. 75. Cost of this revision <br /> <br /> <br />has been estimated at $674,000. <br /> <br /> <br />d. Retaining the Infiltration Gallery in service by con- <br /> <br /> <br />struction of an access causeway from westerly high ground to <br /> <br /> <br />a new collection well and new pumping station. A new force <br /> <br /> <br />main will carry the treated water from the pumping station <br /> <br /> <br />to relocated Conduit 10. Estimated cost of the causeway, <br /> <br />^J <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.