<br /> Gallery, 147 million gallons per day from the Moffat Plant, and 300 million <br />'. gallons per day from the expanded Marston Plant for a. total capacity of 497 <br /> million gallons per day. The capacity of the Marston Plant assumes opera- <br />'J <br /> tion of the new addition at a 50 per cent overload ra.te. <br /> 5. As recommended, the Board may decide to abandon the Infiltration <br /> <br />-. <br /> <br />Gallery with its capacity of 5 million gallons per day due to the Chatfield <br /> <br /> <br />Project. Total plant capacity will drop to 492 million gallons per day if <br /> <br /> <br />the Board should so decide. If such should be the case, the Moffat Plant <br /> <br /> <br />addition of 60 million gallons per day will be needed by 1976 and the Rox- <br /> <br /> <br />borough Plant of 100 million gallons per day by 1982 to meet estimated maxi- <br /> <br /> <br />mum day water demands. <br /> <br /> <br />6. Construction of the Chatfield Project will affect in some degree <br /> <br /> <br />the following Board facilities: Kassler Treatment Plant, Infiltration Gal- <br /> <br /> <br />lery, Bean Wells, Plum Creek Pumping Station, Conduit 10, Conduit 20, Conduit <br /> <br /> <br />24, Conduit 8 Extension, Platte Canon Reservoir, La.st Chance Ditch Pumping <br /> <br /> <br />Station, Platte Canon River flume, City Ditch diversion structure, water <br /> <br /> <br />rights, land, and structures at the Kassler Plant. Conduit 10, Plum Creek <br /> <br /> <br />Pumping Station, Conduit 24, City Ditch diversion structure, and residential <br /> <br /> <br />structures at the Kassler Plant will have to be relocated. <br /> <br /> <br />7. The Corps of Engineers has established the maximum pool ele- <br /> <br /> <br />vation of Chatfield Reservoir to be 5500. The maximum elevation of any <br /> <br /> <br />conservation pool will be 5426. <br /> <br /> <br />8. The Corps has proposed a plan protecting or relocating the af- <br /> <br /> <br />fected water works facilities to make the Board nwhole" after construction <br /> <br /> <br />of the Chatfield Project. Except for the cost of protective works around <br /> <br /> <br />Kassler Plant, cost estimates for the Corps plan were prepared by Black & <br /> <br /> <br />Veatch. This plan includes: <br /> <br />- 4 - <br />