My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05449
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:23 PM
Creation date
10/12/2006 1:02:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1948
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1948
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />transformer and electrical equipment for the Savage pumping plant. <br />The repayment contract, approved as to form by the Secretary, has <br />been signed b~7 the Savage Irrigation District and now awaits valida- <br />tion by the court. Scheduled preconstruction surveys on other units <br />were well advanced. Costs to June 30, 1948 were $317,266. <br /> <br />'- <br /> <br />~ICK UNIT-1ll) <br /> <br />Description: Bostwick Unit is located in the south central part <br />of Nebraska and north central Kansas. Approximately 90,000 acres of <br />land will be irrigated from the Republican River with water supply con- <br />trolled by Harlan County Dam now under construction by the Corps of <br />Engineers. <br /> <br />I-- <br />i- <br /> <br />Program FY48 llioo. 000) : Data il topograph ic surveys and land <br />classification will be essentially completed fo~ the entire unit this <br />fiscal year. It is anticipated that a repayment contract with the <br />Bostwick Irrigation District will be consummated in calendar year <br />1948, tRUS permitting construction on the Superior-Courtland Diversion <br />Dam and Superior Canal late in fiscal year 1948. <br /> <br />Accomplishmo~ts FY48: Negotiations for repayment contract with <br />the Bostwick Irrigation District began on ~~y 21, 1948. Representa- <br />tives of the Bureau and the District Board agreed that discussions of <br />monetary obligations should be delayed until all questions regarding <br />the form of contract could be settled. Approximately 66 percent of <br />the acroage and 61 percent of the landowners had signed the petition <br />for organization of an Irrigation District in Kansas. Preconstruction <br />surveys have been deferred pending outcome of repayment negotiations. <br />Costs to June 30, 1948 were $394,884. <br /> <br />MmAGE FLATS PROJECT (15) <br /> <br />Description: . Mirage Flats is located in northwestern Nebraska <br />in the Niobrara River Basin. Irrigation water will be supplied for <br />12,000 acres of land lying south of Hay Springs, Nebraska. Construc- <br />tionof this project began under the WCU program in January 1941. <br />The principal feature is Box Butte Dam ~ocated on the Niobrara River <br />north of Alliance. The dam is an earthfill structure 87 feet high <br />with 8 crest length of 5,508 feet. Capacity is 31,300 acre-feet. <br /> <br />Program FY48 ($;1.48.400): The program includes work by Govern- <br />ment forces on Box Butte Dam and the irrigation and drainage system. <br /> <br />Accomt)11shments FY48: Government forces completed Horn drain <br />excavation, Bray lateral siphon, and placed ripr$p on the upstream <br />slope of Box Butte Dam. Costs to June 30, 1948 were $l02,678. <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.