My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05441
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05441
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:22 PM
Creation date
10/12/2006 1:01:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
6/1/1949
Author
DOI
Title
The Interior Department in the Missouri Basin - Progress Report 1949
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Program FY49 <br /> <br />Funds available, (;;1,645,138. <br /> <br />The access road and GoverlllDent <br />camp were to be completed and <br />construction was to start on <br />Shadehill Dam. <br /> <br />Accomplishments EXk2 <br />Costs to June 30, 01,311,368. <br /> <br />The camp and access road were com- <br />pleted. A contract was awarded on <br />December 31, 1948 for construction <br />of the dam. It was 10 percent com- <br />plete on June 30, 1949. <br /> <br />BIXBY UNIT <br /> <br />Description: Bixby Dam, a conservation and control structure, <br />will be located a short distance below the confluence of the north and <br />south forks of the Noreau River about 35 miles northwest of the TOIffi <br />of Faith, South Dakota. The reservoir will have 84,000 acre-feet of <br />conservation storage to furnish irrigation water supply for about <br />11,700 acres between Bixby Dam and Green Grass Dam. Of the remaining <br />capacity, there will be 8,000 acre-feet allocated to silt control, <br />102,000 acre-feet allocated to flood control, and 282,000 aere-feet <br />of super storage to reduce the maximum spillway requirements. The <br />total capaoity of the reservoir will be 476,000 acre-feet. <br /> <br />", <br /> <br />The dam at Bixby will be an earthfill structure, 103 feet above <br />the stream bed with a total crest length of 9,500 feet. <br /> <br />Prol!ram FY49 <br />Funds available, $901,460. <br /> <br />Construction was scheduled for <br />completion on the access road <br />and temporary Government camp. <br />Work was to start on Bixby Dam. <br /> <br />Accomplishments FY49 <br />Costs to June 30, $554,576. <br /> <br />Residences of the Government camp <br />were completod as well as the ac- <br />cess road. <br /> <br />No work was done on the dam <br />pending results of water quality <br />studies. <br /> <br />, GIENDO UNIT <br /> <br />Description: Glendo Dam .rill be located on the North Platte River <br />approximately six miles southeast of Glendo, 1rlyoming. The dam will <br />provide approximately 150,000 acre-feet of storage facilities in order <br /> <br />- <br /> <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.