My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05425
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:18 PM
Creation date
10/12/2006 1:01:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8101
Description
Arkansas River Basin Description
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1962
Author
High Plains SCD
Title
Watershed Work Plan - Limon Watershed Protection Project - Elbert and Lincoln Counties - Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />0=1760 <br /> <br />- 17 - <br /> <br />I <br /> <br />I <br /> <br />Installation services cost estimates include the costs for <br />Service personnel to: (1) complete foundation and spillway <br />investigations and soils investigations using power drill and <br />test pits to obtain samples for geologic and soil laboratory <br />analysis to assist in the structural design, (2) overhead costs <br />for local, state, Engineering and Watershed Planning Unit, <br />Cartographic Unit, and Washington personnel and (3) stakeout, <br />inspection, supervision, completion and related costs for <br />construction completion of structures. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Other Costs,- These are sponsor costs paid from local funds <br />and include: (1) Administration of contracts, and (2) Land, ease- <br />ments, and rights-of-way. <br /> <br />I <br /> <br />I <br /> <br />Administration of contracts include estimated costs for <br />administrative, legal and clerical services incurred by the <br />Contracting Local Organization in carrying out the letting and <br />completion of construction contracts. This will also include the cost <br />of a local Contracting Officer or Sponsor Representative to work <br />with the contractor and the Soil Conservation Service personnel, <br /> <br />I <br /> <br />I <br /> <br />Land, easements, and rights-of-way costs include all estimated <br />expenditures by the sponsors to provide all of the necessary land, <br />easements, and rights-of-way for the design, construction, completion <br />and later access for operation, inspection and maintenance of the <br />structures. <br /> <br />I <br /> <br />A local realty firm which deals in ranches estimated the per <br />acre value of the land needed in easements and rights-of-way. <br /> <br />I <br />:1 <br /> <br />each <br /> <br />The estimated total Public Law 566 and Other obligations for <br />fiscal year during the three-year insta11ation'period are: <br />Fiscal Year Public Law 566 Other <br /> ~ <br />1963 $ 80,600 $11,510 <br />1964 121,534 5,275 <br />1965 3,125 <br />Total $202,134 $19,910 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.