My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05401
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:12 PM
Creation date
10/12/2006 1:00:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.D
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1984
Title
Plan of Study and Request for Proposal - Monument Creek Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />. <br /> <br />. <br /> <br />Monument Creek Dam <br />Request for Proposals <br /> <br />Introduction <br /> <br />The Colorado Water Conservation Board (CWCB) and the Dolores <br /> <br /> <br />Water Conservancy District (DWCD) with funding to be provided by <br /> <br />CWCB (House Bill 1102, 1983 Session) will contract with a <br /> <br /> <br />consulting engineering firm (Consultant) for a geological and <br /> <br />ru" <br />geotechnical study gf the proposed Monument Creek Dam, near the <br /> <br />town of Dove Creek in southwestern Colorado. <br /> <br />The purpose of this Request for Proposals (RFP) is to <br />specify: <br /> <br />(a) the services which will be required; <br /> <br />(b) the content of the proposal to be submitted by each of <br />the firms selected for discussions pursuant to section <br />24-30-1403(2), CRS, as amended; and <br /> <br />(c) the process which will be utilized by the CWCB staff in <br />evaluating the proposals and ranking the firms as <br />required by section 24-30-1403(2), CRS, as amended. <br /> <br />Study Objective <br /> <br />To evaluate at a feasibility level of detail and based on <br /> <br /> <br />geological and geotechnical data the engineering feasibility of <br /> <br />and cost of constructing a dam at a site on Monument Creek at the <br /> <br />general location described below. <br /> <br />ed <br />rfp/mc <br /> <br />,,...-./' ~ <br />c/"<':'--: f"", <br />
The URL can be used to link to this page
Your browser does not support the video tag.