Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />for storage, the consumptive use of users, size the reservoir, <br /> <br />and propose an operating plan for the reservoir with an 5-year <br />life cycle. <br /> <br />Suggested possible users <br />(a) municipal and industrial <br />(b) fish and wildlife <br />(c) recreation <br /> <br />If no possibility exists for any of the above uses, then it <br /> <br /> <br />is important that the ideas be discussed and recognized. <br /> <br />Task 3- Geotechnical and Geological Work <br /> <br />Using the results of Task 1 and Task 2, the contractor will <br />outline a field investigation of the site to complete the <br />information necessary to preliminarily design a dam at this <br />site. The contractor will provide CWCB with a written report <br />indicating the need for borings, test holes, test pits, and <br />geophysical soundings if needed, the proposed program shall be <br />tailored to obtain the information needed to eliminate this site <br />from further consideration as a reservoir or will fill in the <br /> <br /> <br />information that is presently lacking and is necessary to <br /> <br /> <br />complete the design for a structure at this site. <br /> <br />-3- <br />