Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />The work shall include the necessary testing of local <br /> <br />material for use in construction of the proposed project. <br /> <br />Products from this task will be bore hole logs, logs of test <br /> <br /> <br />pits. location map of bore holes and test pits, location of <br /> <br /> <br />amount of construction materials and results of laboratory <br /> <br /> <br />testing. It should also include stability analysis of reservoir <br /> <br /> <br />embankment with proposed materials. <br /> <br />Task 4 - preliminary Cost Estimates <br /> <br />Using the data above prepare a preliminary feasibility level <br /> <br /> <br />cost estimate for a project at this site. The cost should be a <br /> <br /> <br />function of the size of the dam, materials available for <br /> <br /> <br />construction, local geotechnical and geological conditions. This <br />study should include the following: <br /> <br />1. Description of the derivation of unit construction costs <br /> <br />and pertinent factors affecting estimated construction <br /> <br />costs. <br /> <br />2. A tabulation that shows the quantities, unit cost, and <br /> <br /> <br />total cost of each type of work or material for each <br /> <br /> <br />major structure and each class of minor sturctures. <br /> <br /> <br />Lump-sum estimates should be avoided. This tabulation <br /> <br /> <br />if lengthy may be included in the appendix. <br /> <br />-4- <br />