My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05401
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:18:12 PM
Creation date
10/12/2006 1:00:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.D
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1984
Title
Plan of Study and Request for Proposal - Monument Creek Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Work Tasks <br /> <br />The following task description describe the work to be <br /> <br /> <br />carried out in this study and to define the amount of work and <br /> <br /> <br />level of detail of the various components. <br /> <br />Task l-Date Accumulation and Review <br /> <br />The contractor shall obtain copies of and assemble in <br /> <br /> <br />logical order all previous studies, conducted on the site by <br /> <br /> <br />USBR and any reports, maps, and geotechnical documentation of the <br /> <br /> <br />area. (Both published and unpublished.) Additional data may be <br /> <br /> <br />available at U.S. Geological survey, U.S. Soil Conservation <br /> <br /> <br />Service, or by private companies or individuals. <br /> <br />The contractor will evaluate this material and submit a <br /> <br /> <br />brief report outlining the deficiencies in the data and <br /> <br /> <br />recommending a program for developing the needed data and the <br /> <br /> <br />report will include a bibliography of items and reports reviewed. <br /> <br />Task 2- Reservoir Capacity Determination <br /> <br />This task will analyze and develop the water requirements <br /> <br />for the project. Analyis will follow the outline suggested in <br />CWCB Guidelines, 1978, as detailed in Chapter V. The intent is <br />to identify all possible users, identify the quantities available <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.