My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05278
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:39 PM
Creation date
10/12/2006 12:56:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Hydrosphere
Title
Yampa River Basin - Alternatives Feasibility Study - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />002591 <br /> <br />Plan of Study <br /> <br />23 <br /> <br />TASK 3 <br />RESERVOIR SITE IDENTIFICATION AND PRELIMINARY SCREENING <br /> <br />Overview <br /> <br />The general objective of Task 3 is to identify alternative water development sites in sufficient <br />detail to permit preliminary screening of these sites. This work will be accomplished by <br />identifying the potential reservoir sites in the basin, making preliminary estimates of physical <br />supplies at each site, performing a fatal flaw analysis of the sites and evaluating the efficacy of <br />each site in meeting projected water and recreation needs of the study area. The final step in <br />this task will be preparation of screening recommendations for consideration by the TSC. <br />Final selection of up to six candidate sites will be made by the TSC. <br /> <br />Up to six candidate sites will be selected for further evaluation in Task 5. In addition, <br />Elkhead Reservoir and Ralph White Reservoir will be evaluated as candidate sites. A <br />contingency will be reserved for fatal flaw evaluation of two additional sites at the beginning <br />of Task 5. Additional potential sites must be identified by April 1, 1991. <br /> <br />Task 3 will be divided into three sub-tasks: <br /> <br />. Sub-task 3a: Identify Potential Sites <br />Sub-task 3b: Characterize Potential Sites <br />Sub-task 3c: Select Candidate Sites <br /> <br />TaskLeader: Dr. Charles M. Brendecke <br /> <br />Key Technical Support: Mr. Edward Armbruster and Mr. Peter Foster will assist Dr. <br />Brendecke in performing this task. Mr. Benjamin Harding will <br />prepare the hydrologic analyses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.