Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />il <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />01)2575 <br /> <br />Plan of Study <br /> <br />6 <br /> <br />will also be accepted which have been identified later by the TSC and the PAG. Up to eight <br />sites (including Ralph White Reservoir and Elkhead Reservoir, which have been identified by <br />the TSC) will be selected In Task 3 and subjected to a detailed evaluation in Task 5. In <br />addition, schedule and budget contingencies have been reserved to allow for two additional <br />sites to be evaluated In Task 5, should such sites be identified by April 1, 1991. <br /> <br />Provision has also been made for an iterative approach to fonnulation and evaluation of <br />projects. This process will first take place In Tasks 6 and 7 where up to six projects will be <br />fonnulated and evaluated. However, Hydrosphere and the TSC recognize that the results of <br />these tasks will likely provoke additional questions. It is possible that during the review of <br />projects to take place In Task 8, new project fonnulations or new evaluation criteria will <br />become evident. Thus, Tasks 8 and 9 have been structured to allow for refonnulation of new <br />projects and re-eva1uation of up to three projects using the criteria developed for Task 7 as <br />well as new evaluation criteria introduced in Task 8. <br /> <br />oS,;-,-__", <br />