My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05149
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:10 PM
Creation date
10/12/2006 12:53:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8180.800
Description
Purgatoire River Project
Basin
Arkansas
Water Division
2
Date
9/1/1949
Author
RJ Tipton
Title
Engineering Report on Flood Control and Irrigation District with Particular Reference to the Piedmont Bridge Dam and Reservoir Site
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;:'}'L <br />.i:'~3 <br /> <br />("") <br />0) <br />CJl <br />OJ <br /> <br />"",,' <br />"::."':"J <br /> <br />..'~.' "J <br /> <br /><j' <br /> <br />k <br /> <br />.;-:11<.., <br />'~p <br /> <br />! <br />, II <br />I '1! <br />t <br />.~ <br /> <br />io <br /> <br />. <br /> <br />A review of the authorizing document, requested by the <br />Co~~ittee on Flood Control, ~ouse of Representatives, in a <br />resolution adopted March 20, 1945. was made by the Corps of <br />Engineers, and a review report was prepared by the U. S. ~gi- <br /> <br />neer Office in Albuquerque, New Mexico. This report and the <br /> <br />findings have been reviewed and are discussed hereinafter. <br />Bureau of Reclamation. The Bureau of Reclanmtion began <br />investigations of the Trin~dad Project in January 1937. Several <br />reports on the project have been prepared, but none has been <br />published. All the reports are subject to revision; therefore, <br /> <br />the data contained thereiq are not available for publication or <br />release. The Bureau's first report was made in 1941. In that <br />report the plan of development included a detention reservoir <br /> <br />at the Sopris site to provide t'loodcontrol and to make addi- <br />tional water available for trrigation,. Preliminary econb~ic <br />studies of the project were made. <br /> <br />.' <br />The second Bureau report is dated December 191f5. In that <br /> <br />report various plans 4nd various reservoir capacities were in- <br /> <br />vestigated, and economic studies were made to determine tne <br />ratio of costs to'benefits of the various plans. <br /> <br />Another report,which-is essentialJ.y a review report of the <br /> <br />project, was made available to the Corps of Engineers for use <br /> <br />in determining irrigation benefits contained in the Corps' re- <br />view report of 1946. <br /> <br />Review Report of Corps of Engineers. The review report was <br />made by the Corps of Engineers for the specific purpose of "de- <br /> <br />termining whether any modifications of the recommendation con- <br />tained therein (authorizing document) should be made at this time <br /> <br />-7- <br /> <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.