My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05149
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:10 PM
Creation date
10/12/2006 12:53:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8180.800
Description
Purgatoire River Project
Basin
Arkansas
Water Division
2
Date
9/1/1949
Author
RJ Tipton
Title
Engineering Report on Flood Control and Irrigation District with Particular Reference to the Piedmont Bridge Dam and Reservoir Site
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />, <br />I <br /> <br />l:h~1' <br />f,~1{~ \ <br />'1 <br />~~j <br /> <br />~ <br />. <br />., <br /> <br /><'~"'1 <br />,'1.;.;. <br />,~.::. <br /> <br />~ <br />.. <br />l <br /> <br />i <br />I . <br />, <br />~ <br /> <br />, <br />:: <br /> <br />o <br />en <br />c.n <br />--1 <br /> <br />the upper basin without reservoir development <br /> <br />and such development is precluded because of <br />scarcity of reservoir possibilities.........". <br />This was followed by a preliminary examination report on flood <br />control of the watershed of the Purgatoire and Aplshapa Rivers <br /> <br />in LoS Animas County. The report was unfavorable to the survey <br /> <br />of the rivers in Las ft~imas County at federal expense. However, <br />the report was not published, and the Congress has not acted on <br /> <br />it. <br /> <br />A detailed report of the Purgatoire River was prepared py <br /> <br />the Corps of Engineers and submitted to the Congress as House <br />Document No. 387, 78th Congress, 2nd Session. In that report <br /> <br />the Chief of Engineers recommended improvement of the Purgatoire <br />River by levees and channel works for the protection of the City <br />of Trinidad, at an estimated cest to the Government of $909,000. <br /> <br />Local interests would be required to provide the rights-of-:way, <br />make the necessary che.nges in bridges and utili ties, and' main- <br /> <br />taio and operate all the works in accordance with reBulations <br /> <br />prescribed by the Secretary of War. The cost of the improvement <br />to local interests was estimated at $126,000, making a total <br />estj.mated project cost of $1,035,000. The project was authorized <br />by the Congress in Public IE.w No. 534, 78th Congress, 2nd Ses- <br />sion. In December, 1948, it was reported by the District Engi- <br />neer that a total of $30,000 had been alloted for planning the <br />authorized project, that an estimated $45,000 was required for <br />completing the planning, and that $1,971,240 was required for <br /> <br />" <br /> <br />construction. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.