My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05149
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:10 PM
Creation date
10/12/2006 12:53:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8180.800
Description
Purgatoire River Project
Basin
Arkansas
Water Division
2
Date
9/1/1949
Author
RJ Tipton
Title
Engineering Report on Flood Control and Irrigation District with Particular Reference to the Piedmont Bridge Dam and Reservoir Site
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~I)' <br />'..'." .. <br />'" <br />.~\. .c: <br />':.:. ' <br />','\.' <br /> <br />ft <br />L,I <br />~)' <br /> <br />I <br /> <br />~.w <br />,JI <br />rt <br />I <br />I <br />I <br /> <br />J <br />I <br />; <br />j <br /> <br />\, <br />i <br />i. <br />i . <br /> <br />i. <br /> <br />o <br />0) <br />(Jl <br />'-0 <br /> <br />to Trinidad and its vicinity, and to provide an addition~l and <br /> <br /> <br />regulated water supply for agriculture, could be justified. In <br /> <br /> <br />the review report, findings of the District ,Engineer were that <br /> <br /> <br />no additional work should be authorized because of the unfavorable <br /> <br />relation between costs and benefits. These findings were con- <br /> <br /> <br />curred in by the Division Engineer and the Chief of Engineers. <br /> <br />A copy of the review report was made available to the <br /> <br />Mayor of Trinidad for review by him and other interested parties <br /> <br /> <br />in the area. After review of the report by proponents of a <br /> <br /> <br />multiple-purpose project, it was believed by them that some <br /> <br />benefits to be provided by a reservoir might have been over- <br /> <br />looked, and that such benefits might be sufficient to justify <br /> <br />the project. As a result, R. J. Tipton and Associates, Inc., <br />was retained to study the reports of the Corps of Engineers and <br /> <br />the Bureau of Reclamation, and to make certain original studies, <br />and to make recommendations based upon its findings. A thorough <br />analysis has been made of the reports and additional studies have <br /> <br />been made on water supply. Economic studies have also been made <br /> <br />based on data obtained by County and other officials. A summary <br /> <br />of these studies, findings of the reviews, and conclusions and <br /> <br />recommendations follow. First there is presented the summary, <br /> <br />conclusions and recommendations, which is followed by a dis- <br /> <br />cussion of previous reports and investigations. The details of <br /> <br />the current investigation are then outlined. <br /> <br />~UMMARY, CONCLUSIONS AND RECOMMENDATIONS <br /> <br />The cost of the Piedmont Bridge Reservoir, which is con- <br /> <br /> <br />~ldered to be the best reservoir site above Trinidad, under 1949 <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.