My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05050
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:43 PM
Creation date
10/12/2006 12:48:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1989
Author
DOI BOR
Title
Salinity Update - September 1989 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br />0:> <br />-.J <br />-.} <br /> <br />USDA held operating <br />procedures workshops <br /> <br />USDA workshops were held in <br />Grand Junction and Vernal, Utah. At <br />these workshops, USDA personnel <br />received training on their responsibilities <br />for program implementation. In addi- <br />tion, issues and concerns were voiced by <br />members of the local salinity coordinat. <br />ing committee. <br /> <br />Participants included representation <br />from ASCS, ASC County Committees, <br />SCS, Extension Service, Bureau of <br />Reclamation, Fish and Wildlife Service, <br />the local Soil Conservation District, and <br />others. <br /> <br />Lower Gunnison Basin <br /> <br />Under the cooperative agreement <br />with the Uncompahgre VaHey Water <br />Users Association, Reclamation has <br />obtained an inventory of the water <br />system needs for Reclamation's Winter <br />Water portion of the project. One of <br />three water suppliers is expected to be <br />ready for construction in fiscal year <br />1990. The other two suppliers will <br />probably have to complete their designs <br />in fiscal year 1990 because of a shortage <br />of funds in fiscal year 1989. <br /> <br />The Appropriations bill for energy <br />and water development (including <br />Reclamation) for fiscal year 1990 <br />includes $2.5 miliion for initiating <br />construction activities in the Winter <br />Water portion of the Lower Gunnison <br />Basin Unit. <br /> <br />In the North Fork area, no viable <br />plan has been found and a concluding <br />report is being prepared. <br /> <br />WYOMING <br /> <br /> <br />UTAH <br /> <br />NEVADA <br /> <br />P,;ceS." Raf..1 R;va,. <br /> <br />\O",",V","O"_"O" <br />lV"OJ'nRi_1 <br />.,.paValloy <br />LasV"IJasWash <br /> <br />L.V"'~;nSprj_ <br /> <br />San Juan RlY,r lInlt <br /> <br />CALIF <br /> <br />NEW <br />MEX <br /> <br />Plrk....O'... <br /> <br />. Bureau 01 Reclamation <br />Salinity Control UniU <br />o USDA <br />. BLM <br /> <br />Units of the Colorado River Water Quality Improvement Program <br /> <br />Paradox Valley Unit, Colorado <br /> <br />The facility will be essentially com- <br />plete this summer and ready for test <br />injection pending the selection and test- <br />ing of chemical precipitate inhibitors. <br />Samples taken from the primary injec- <br />tion formation, the Leadville Formation, <br />show that without the use of chemical <br />inhibitors, the injection brine will react <br />with water already in the formation to <br /> <br />form about 30 tons of solids per day. <br />Reclamation, through contracts with <br />private consultants, DOE, and USGS <br />geothermal experts, is evaluating the <br />performance of several different mixes <br />of inhibitors. Reclamation is also evalu- <br />ating the effectiveness of preflooding to <br />prevent the mixing of the two brines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.