My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PHASE II I <br /> <br />~ ACTIVITY ONE - REGIONAL REVIEW OF THE NATIONAL REPORT <br />~ <br />..-i The objective of activity one is to provide the ~lissouri River Basin <br />Commission the opportunity to review and comment on the draft national <br /> <br />assessment report in one subactivity. <br /> <br />Subactivity 1 - Review and Comnent on the National Assessment Report <br /> <br />During subactivity 1 all the regional participants will have the <br /> <br />opportunity to review and comment on the draft national assessment report. <br /> <br />These comments will be compiled and analyzed by the MRBC staff and presented <br /> <br /> <br />to the ~1RBC for approval and action through the Overview Committee. Sub- <br /> <br />sequently, as approved by action of the Missouri River Basin Commission, a <br /> <br />consistent set of comments will be transmitted to the \-IRC and to reqional <br /> <br />assessment participants. <br /> <br />Section IV -- Organizational Structure <br />The organizational structure, as displayed in Figure 2, will be imple- <br /> <br />mented to facilitate conducting the specific problem analysis and related <br /> <br />activities in the Missouri Region. <br /> <br />The regional study director is responsible for managing the work proqram <br /> <br /> <br />necessary to carry out the activities described in this agreement and will <br /> <br /> <br />be the Missouri River Basin Commission's primary contact for any national <br /> <br />assessment activities within ~~issouri Region. <br /> <br />The participants and their desiqnated responsibilities for each sub- <br /> <br />activity are listed in Table 1 (also refer to Figure 2), <br /> <br />Section V -- \-Iork Schedules and Funding Plans <br /> <br />A. Work Schedules <br /> <br />Table 2 displays the schedule proposed for accomplishinq all the <br /> <br />activities described in Section III of this memorandum of agreement. <br /> <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.