Laserfiche WebLink
<br />problem analysis work flow diagra~). and as summarized ,in Table I, <br /> <br /> <br />which lists the activities to be conducted by the ~lissouri River Basin <br /> <br />Commission during the specific proble~ analysis by displaying the sub- <br /> <br />o <br />(."'") <br />cJ' <br />~ <br /> <br />activities, the participants and their designated responsibilities. <br /> <br />Phase I activities (the preimplementation activities) will be completed <br /> <br />upon consumation of this memorandum of agreement. <br /> <br />Phase II composed of four specific activities -- (1) problem <br />identification, (2) selection of state/regional desires and objectives, <br /> <br />problem screening and document assumptions, (3) development of information <br /> <br />describing selected problems, and (4) selection of state/re~ional priorities <br /> <br />and recommendation and preparation of specific problem analysis report -- <br /> <br />will be completed by January 1977. <br />Phase III composed of one specific activity -- (1) review of and comment <br />on the Natio~al Assessment Report -- will be completed by October 1977. <br /> <br />PHASE I <br /> <br />ACTIVITY ONE - PRE IMPLEMENTATION <br /> <br />The objective of this activity is to prepare and consu~ate the <br /> <br />memorandum of agreer:1ent between the ~1i ssouri Ri ver Bas in Comr:1i ss i on and <br /> <br />the U.S. \later Resources Council. This activity will be completed when <br /> <br />the memorandum of agreement is signed by both parties. <br /> <br />PHASE II <br /> <br />ACTIVITY O~IE - PROBLEI~ IDENTIFICATION <br /> <br />The objective of this activity is to identify, locate on a map, and <br /> <br />briefly describe in an initial problem list, the existing and the anticipated <br /> <br />future water and related land resource problems within the '1issouri Region <br /> <br /> <br />which can be identified from the existing conditions, the central case <br /> <br />-4- <br />