My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04701
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:13 PM
Creation date
10/12/2006 12:31:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Project
State
CO
Basin
South Platte
Water Division
1
Date
11/15/1981
Author
Ward Fischer
Title
Poudre Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />storage facilities making up each alternative project will be <br />determined, and through the model, prioritized use of natural <br />and stored flows will be determined. Economic factors, applied <br />through the model, will indicate the relative economic effect- <br />iveness of the several alternative projects. This process, in- <br />cluding the previous screening, will be an iterative plan for- <br />mulat~on process. As various alternative projects are evaluated, <br />it is anticipated that modifications may be made in :he combina- <br />tion of facilities making up an alternative project, necessitat- <br />ing a reevaluation of the alternative project. Dependent on the <br />results of the evaluation, some alternative projects may be <br />dropped and others may be considered for evaluation. Close coor- <br />dination will be maintained ~ith the CWCB to insure that the pro- <br />ject or projects considered are compatible with the desires and <br />aims of the state. <br />The results of this evaluation will be finalized and a <br />candidate project or projects will be selected, in cooperation <br />with the CWCB, for further study at the reconnaissance level. <br />The process of identif.ying, selecting, and evaluating the <br />candidate project or proje~ts, will be document@d in an interim <br />report and submitted to th~ CWCB. <br /> <br />PHASE IV: RECONNAISSANCE PLAN FOID1ULATION <br />Once a candidate project or projects are selected, addi- <br />tional data will be sought out or generated as required. <br />A more intense evaluation of geological conditions at the <br />sites of existing and proposed facilities that make up the can- <br />didate plan will be conducted. This evaluation will be made <br />using existing data but will be more intense and in-depth than <br />the investigation that was performed in the preliminary stages, <br />and will include a reconnaissance level assessment of foundation <br />conditions, seepage, and sedimentation. <br />The hydrologic studies performed during the previous phase <br />will be reviewd and refined in order to make them commensurate <br />with reconnaissance level of study, considering reservoir yield, <br /> <br />II~6 <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.