Laserfiche WebLink
<br />"..:./ . I" . <br /> <br />. <br /> <br /> Construction Cost Estimate Prepared by Grand Junction Projects Office <br /> Feasibility Estimate Lower Gunnison Basin Unit Group <br /> Prices as of October 1991 February 25, 1992 <br /> Quantitv Unit Unit Cost Subtotals Totals <br /> Laterals Under the South Canal <br /> Land and Rights <br /> Rights of Way Aquisrtion 60 miles $200,00 $12,000 $12,000 <br /> Relocation of Property of Othem <br /> Farm Road Crossings 84 ea $500,00 $42,000 <br /> County-Road Crossings 7 ea $1,000,00 $7,000 $49,000 <br /> Waterways <br /> Concrete Pipe <br />li~:' " 30776 ~ $10,84 $333,600 <br /> 33249 ~ $15,16 $504,100 <br /> 18" -' 46730 ~ $18,28 $854,200 <br /> 21' , 94141 ~ $19,83 $1,866,800 <br /> 24" 8800 ~ $22,52 $198,200 <br /> 27' , 40236 ~ $23,07 $928,200 <br /> 3011 14650 ~ $29,88 $437,700 <br /> 36" 45626 ~ $41,22 $1,880,700 <br /> 42" , 1500 ~ $84,65 $97,000 $7,100,500 <br /> Pipe Plant Cost - 34% Lump Sum Is $340,000 $340,000 <br /> - ,- <br /> Waterway Struclu res <br /> Parshall Flume Turnouts 251 ea $1,500,00 $376,500 <br /> Drain inlets 2 ea $1,766,00 $3,500 $380,000 <br /> , <br /> Waterway Protective Works <br /> Culverts, existing drains 60 miles $2,000,00 $120,000 $120,000 <br /> , ' <br /> Cost S8,001,500 <br /> 20% Contingencies $1,600 300 <br /> Subtotal $9,601,800 <br />I - - 14% Eng and Overhead $1,344,300 <br /> T etal Construction Cost $10946,100 <br /> Laterals Under the Loutzenhizer Canal <br /> Land and' Rights" ' ' <br /> Rights of Way Aquisrtion 24,5 miles $200,00 $4,900 $4,900 <br /> Relocation of Property of Others <br /> Farm Road Crossings 46 ea $500,00 $23,000 <br /> County Road Crossings " 7 ea $1,000,00 $7,000 $30,000 <br /> Waterways <br /> PVC Pipe <br /> 8" 1171 ~ $10,79 $12,600 <br /> Concrete Pipe <br /> 12" 36765 ~ $10,84 $398,500 <br /> 15" 10256 ~ $15,16 $155,500 <br /> 16" 7754 ~ $18,28 $141,700 <br /> 21" 34924 ~ $19,83 $692,500 <br /> 24" 8850 ~ $22,52 $199,300 <br /> 42" 29832 ~ $64,65 $1,928,600 $3,528,700 <br /> Pipe Plant - 14% Lump Sum Is $140,000 $140,000 <br /> Waterway Structures <br /> Parshall Flume Tumouts 182 ea $ 1 ,500,00 $273,000 <br /> Drain Inlets 1 ea $1,762,00 $1,800 $274,800 <br /> Waterwav Protective Works 24,5 miles $2,000,00 $49,000 $49,000 <br /> Cost $4.027,400 <br /> 20% Contingencies $805,500 <br /> Subtotal $4,832,900 <br /> 14% Eng and OVerhead $676,600 <br /> Total Construction Cost 55,509,500 <br /> <br />. <br /> <br />..... <br />en <br />en <br />cr) <br /> <br />'. <br />