Laserfiche WebLink
<br />~, ~ l ".'~' <br /> <br />.- <br />0) <br />0) <br />CJ1 <br /> <br />Construction Cost Estimate Prepared ,by Grand Junction Projects Office <br />Feasibility Estimate Lower Gunnison Basin Unit Group <br />Prices as of October 1991 February 25, 1992 <br /> Quantitv Unit Unit Cost Subtotals Totals <br />Gamet Canal <br />Land and Rights <br />Rights of Way Aquis~ion <br />Aquis~ion of Land 12,92 acres $1,000,00 $12,900 <br />Documentation 10,66 miles $500,00 $5,300 $18,200 <br />Relocation of Property of others <br />Includes 7 farm road crossings, 1 gaging station, 1 <br />water line crossing, 6 county road crossings, and <br />1 irrigation crossing. <br />Irrigation crossing in 75 cfs reach of canal , ea $2,440,00 $2.400 <br />County Road crossing in 80 cfs reach of canal 2 ea $13.447,00 $26,900 <br />County Road crossing in 65 cfs reach of canal 2 ea $10,957,00 $21,900 <br />County Road crossing in 60 cis reach of canal 1 ea $9,297,00 $9,300 <br />County Road crossing in 55 cfs reach of canal 1 ea $9,297,00 $9,300 <br />Farm road crossing in 90 cfs reach of canal 4 ea $8,251,00 $33,000 <br />Farm road crossing in 80 cfs reach of canal 2 ea $6,782,00 $13,600 <br />Farm road crossing in 55 cfs reach of canal 1 ea $5,487,00 $5,500 <br />Gaging station Lump sum Is $5,900 -- <br />Water line crossing Lump sum Is $1,700 $129,500 <br />Structures and Improvements <br />Stockfencing 112569, n $2,50 $281.400 $281.400 <br />Roads and Road Structures <br />Road Construction I Gravel 10,66 miles $14,000,00 $149,200 $149,200 <br />Waterways <br />PVC Lining <br />Constructio of 94 cfs canal reach 40950 n $57,00 $2,334,200 <br />Construction of 65 cfs canal reach 15342 n $53,00 $813,100 $3,147,300 <br />Waterway Structures <br />Parshall Flume Tumouts 48 ea $2,500,00 $120,000 <br />Check Drops 12 ea $10,018,00 $120,200 <br />Rectangular Incline Drops 3 ea $10,713,00 $32,100 <br />Dillin Inlets 3 ea $1,762,00 $5,300 $277.600 <br />Waterway Protective Works 10,66 miles <br />Cross Drainaoe Facil~ies 6 culverts Lumo Sum Is $216,700 $216,700 <br /> Cost $4,219,900 <br /> 20% Contingencies $844 000 <br /> Subtotal $5,063,900 <br /> 14% Eng and Overhead $708,900 <br /> Total Construction Cost $5.772,800 <br /> <br />. <br /> <br />. <br /> <br />. <br />