<br />Construction Cost Estimate Prepared ,by Grand Junction Projects Office
<br />Feasibility Estimate Lower Gunnison Basin Unit Group
<br />Prices as of October 1991 February 25, 1992
<br /> Quantitv Unit Unit Cost Subtotals Totals
<br />Gamet Canal
<br />Land and Rights
<br />Rights of Way Aquis~ion
<br />Aquis~ion of Land 12,92 acres $1,000,00 $12,900
<br />Documentation 10,66 miles $500,00 $5,300 $18,200
<br />Relocation of Property of others
<br />Includes 7 farm road crossings, 1 gaging station, 1
<br />water line crossing, 6 county road crossings, and
<br />1 irrigation crossing.
<br />Irrigation crossing in 75 cfs reach of canal , ea $2,440,00 $2.400
<br />County Road crossing in 80 cfs reach of canal 2 ea $13.447,00 $26,900
<br />County Road crossing in 65 cfs reach of canal 2 ea $10,957,00 $21,900
<br />County Road crossing in 60 cis reach of canal 1 ea $9,297,00 $9,300
<br />County Road crossing in 55 cfs reach of canal 1 ea $9,297,00 $9,300
<br />Farm road crossing in 90 cfs reach of canal 4 ea $8,251,00 $33,000
<br />Farm road crossing in 80 cfs reach of canal 2 ea $6,782,00 $13,600
<br />Farm road crossing in 55 cfs reach of canal 1 ea $5,487,00 $5,500
<br />Gaging station Lump sum Is $5,900 --
<br />Water line crossing Lump sum Is $1,700 $129,500
<br />Structures and Improvements
<br />Stockfencing 112569, n $2,50 $281.400 $281.400
<br />Roads and Road Structures
<br />Road Construction I Gravel 10,66 miles $14,000,00 $149,200 $149,200
<br />Waterways
<br />PVC Lining
<br />Constructio of 94 cfs canal reach 40950 n $57,00 $2,334,200
<br />Construction of 65 cfs canal reach 15342 n $53,00 $813,100 $3,147,300
<br />Waterway Structures
<br />Parshall Flume Tumouts 48 ea $2,500,00 $120,000
<br />Check Drops 12 ea $10,018,00 $120,200
<br />Rectangular Incline Drops 3 ea $10,713,00 $32,100
<br />Dillin Inlets 3 ea $1,762,00 $5,300 $277.600
<br />Waterway Protective Works 10,66 miles
<br />Cross Drainaoe Facil~ies 6 culverts Lumo Sum Is $216,700 $216,700
<br /> Cost $4,219,900
<br /> 20% Contingencies $844 000
<br /> Subtotal $5,063,900
<br /> 14% Eng and Overhead $708,900
<br /> Total Construction Cost $5.772,800