Laserfiche WebLink
<br />.'1' I I ,.. <br /> <br />. <br /> <br />Construction Cost Estimate Prepared by Grand Junction Projects Office <br />Feasibility Estimate Lower Gunnison Basin Unit Group <br />Prices as 01 October 1991 February 25, 1992 <br /> Quantitv Unit Unit Cost Subtotals Totals <br />East Canal <br />Land and Rights <br />Rights 01 Way Aquisrtion <br />Aquisrtion 01 Land 9,335 acres $200,00 $1,900 <br />Aquisrtion of Land 9,335 acres $1,000,00 $9,300 <br />Documentation 10,27 miles $500,00 $5,100 $16,300 <br />Relocation 01 Property 01 others <br />Includes 10 irrigaton cOlSsings, 2 county road <br />crossings, 31arm road crossings, 1 gaging station <br />and a gas line reiocation -- <br />Irrigaton crossing in 190 cis reach of canal 1 ea $2,512,00 -- '$2,500 <br />Irrigation crossing in 175 cfs reach of canal 2 ea $2,512,00 $5,000 <br />Irrigation crossing in 155 cfs reach 01 canal 4 ea $2,512,00 -- ~10,OOO <br /> -- <br />Irrigation crossing in 120 cfs reach of canal 3 ea $2,479,00 ',' $7,400 <br />County road crossing In 190 cfs reach 01 canal 1 ea $19,279,00 " $19,300 <br />County road crossing in 175 cfs reach 01 canal 1 ea $15,273,00 $15,300 ' <br />Farm Road crossing in 155 cfs reach of canal 2 ea $9,765,00 '$19,500 <br />Farm road crossing in 120 cfs reach of canal 1 ea $8,930g0 ,$8,900, ' <br />Gaging Station Lump Sum Is $5,900 <br />Gas line relocation Lump Sum Is $3,400 $97,200 <br />Structures and Improvements <br />Stockfencing 108451, ~ $2,50 $271,100 $271,100 <br />Roads and Road Structures <br />Road Construction I Gravel 10,27 miles $14,000,00 $143,800 $143,800 <br />Waterways -- " <br />PVC UNING <br />Construction of 198 cfs canal reach 4300 ~ $84,00 $361 ,200 <br />Construction of 175 cfs canal reach 34500 If $81:00 $2,794,500 <br />Construction 01140 cfs canal reach 15400 ~ $68,00 ' , $1,047,200 $4,202,900 <br />Waterway Structures , , - <br />PalShall Flume Tumouts 21 ea $2,500,00 -- $52,500 <br /> .. $195,600 <br />Check Drops, Checks 13 ea $15,047,00 <br />Drain Inlets - 4 Lump sum is $12,900 ,$17,500 <br /> , <br />Waterway Protective Works Lumo sum <br />Cross Drainaoe Facilities Is $325,400 $325,400 <br /> Cost $5,074,200 <br /> 20%' Contingencies $1,014,800 <br /> Subtotal $6,089,000 <br /> 14% Eng and Overhead $852,500 <br /> Total Construction Cost $6,941,500 <br /> <br />t- <br />O') <br />0') <br />.,t.:.. <br /> <br />. <br /> <br />. <br />