My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04698
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:12 PM
Creation date
10/12/2006 12:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
5/22/1992
Author
BOR
Title
Uncompahgre Project SO-JU Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" ", . ~,,' <br /> <br />I-' <br />0') <br />0') <br />w <br /> <br />Construction Cost Estimate Prepared by Grand Junction Projects Office <br />Feasibility Estimate Lower Gunnison Basin Unit Group <br />prices as of October 1991 February 25, 1992 <br /> Quantitv Unit Unit Cost Subtotals Totals <br />Waterway Protective Works <br />Excavation for Structures 6650 cy $4,00 $34,600 <br />Backfill about structures 6650 r::y $2,00 $13,300 <br />Compacting Backfill 6650 r::y $6,00 $39,900 <br />Riprap 450 r::y $16,00 $7,200 <br />Sand and Gravel bedding 230 r::y $14,00 $3,200 <br />Course Gravel 65 r::y $16,00 $1,000 <br />Concrete 610 r::y $180,00 $109,600 <br />Cement 920 bbl $16,00 $14,700 <br />Reinforcement steel 5BOOO Ib $0,50 $29,000 <br />Pipe designated by symbol as follows: <br />24825 410 ff $34,00 $13,900 <br />30825 240 ff $46,00 $11,000 <br />36825 170 ff $59,00 $10,000 <br />46825 170 ff $90,00 $15,300 <br />54825 90 ff $106,00 $9,500 <br />Unlisted ~ems Lumn sum Is $46,700 $359,100 <br /> Cost $9,210.300 <br /> 20% Contingencies $1,642 100 <br /> Subtotal $11,052,400 <br /> 14% Eng and Overhead $1 ,547,300 <br /> Total Construction Cost $12599,700 <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.