<br />.' .1" (I
<br /> Construction Cost Estimate Prepared by Grand Junction Projects Office
<br /> Feasibility Estimate Lower Gunnison Basin Unit Group
<br /> Prices as of October 1991 February 25, 1992
<br />. Quantitv Unit Unit Cost Subtotals Totals
<br />Selig Canal
<br /> Land and Rights
<br />~ Rights of Way Aquisttion
<br />0) Aquisttion of Land 17,59 acres $200,00 $3,500
<br />0) Aquisition of Land 17,59 acres $1,000,00 $17,600
<br />tv Documentation 19,35 miles $500,00 $9,700 $30,800
<br /> Relocation of Property of others
<br /> Includes 8 bridges, 5 farm crossings, 17 irrigation
<br /> crossings, 1 gas line and 1 waterline relocation
<br /> Excavation for structures 2180 cy $4,00 $8,700
<br /> Backfill around structures 1520 cy $2,00 $3,000
<br /> Compacting backfill 1060 cy $6,00 $6,400
<br /> Coarse Gravel '00 cy $21,00 $2,100
<br /> Concrete 405 cy $183,00 $74,100
<br /> Cemant 610 bbl $17,00 $10.400
<br /> Reinforcement steel 41100 Ib $O,SO $20,500
<br /> Aex beam type traffic railing and posts 680 If $17,00 $1',600
<br /> One and one-half inch elastomeric bearing pads 200 sf $42,00 $8,400
<br /> Two inch sponge ru bber filler 26 sf $8,00 $200
<br /> Precast prestressed voided slabs:
<br /> 4-feet by 15-ft 7 ea $1,868,00 $13,100
<br /> 4-feet by 3D-ft 35 sa $3,735,00 $130,700
<br /> 4-feet by 35-ft 14 ea $4,358,00 $61,000
<br /> Welded steel pipe, 3 gage
<br />. 12-inch diameter 385 If $42,00 $16,200
<br />18- inch diameter 22 If $58,00 $',300
<br />Corrugated metal pipe arch:
<br /> 18-inch by 11-inch 20 If $15,00 $300
<br /> SO-inch by 31 -inch 20 If $40,00 $800
<br /> Corrugated metal pipe:
<br /> 12-inch diameter 540 If $'0,00 $5.400
<br /> 18-inch diameter 35 If $15,00 $500
<br /> 60-inch diameter 40 If $70,00 $2,800
<br /> 54-inch diameter 20 If $100,00 $2,000
<br /> Gaging station Lump sum Is $5.400
<br /> Gas line relocation Lump sum Is $1,200
<br /> Waterline relocation Lump sum Is $1,500
<br /> Unlisted items Lump sum Is $46,130 $433,700
<br /> Structures and improvements
<br /> Stockfencing 204336 If $2,SO $510,800 $510,800
<br /> Roads and Road Structures
<br /> Road Construction I Gravel 19,35 miles $14,000,00 $270,900 $270,900
<br /> Waterways
<br /> PVC Uning
<br /> Construction of 270 cfs canal reach 20220 If $98,00 $1,981,600
<br /> Construction of 170 cfs canal reach 17290 If $88,00 $1,521,SOO
<br /> Construction of 65 cfs canal reach 40490 If $66,00 $2,672,300
<br /> Construction of 35 cfs canal reach 241 SO If $34,00 $821,100 $6,996,SOO
<br /> Waterway Structures
<br />. Parshall Flume Tumouts 71 ea $2,500,00 $'n,500
<br />Check Drops, Checks 28 ea $11,975,00 $335,300
<br /> Rectangular Incline Drops 4 ea $10,631,00 $42,500
<br /> Drain Inlets 5 ea $1,799,00 $9,000
<br /> Pipe Drops 3 ea $4,580,00 $13,700
<br /> Chutes 1 ea $27,804,00 $27,800
<br /> Unlisted Items Lump sum Is $2,700 $608,500
<br />
|