Laserfiche WebLink
<br />en <br />.) <br />V) <br />...-I <br /> <br />- <br />'..' <br /> <br />c:) <br /> <br />In order to maintain the Bureau's current construction <br />schedule and not jeopardize continuing appropriations for the <br />construction of the project, I believe that it is desireable to <br />give the Bureau permission to drill anQLpump test the stage 3 <br />salvage wells. However, the Board's consent should be given only <br />under the condition that the stage 3 salvage wells will be capped. <br />after they are pump tested and will not be put into production <br />until the production of stage 1-2 salvage wells has proceeded to <br />the Board's and District's mutual satisfaction and consent to <br />proceed has been given. <br /> <br />. <br /> <br />Recommendation <br /> <br />I recommend that the Board adopt the enclosed resolution, <br />which resolution would give the Board's consent to drill and test <br />pump stage 3 salvage wells sUbject to the several conditions <br />set. forth in the resolution. I .also recommend that, if the <br />resolution is adopted, I be instructed to forward certified <br />copies of the resolution to the District and to the appropriate <br />officials of the Bureau of Reclamation. <br /> <br />JWM/gl <br /> <br />Enclosures: as stated <br /> <br />MEMORANDUM <br /> <br />-2- <br /> <br />9/29/82 <br />