My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04641
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:29:42 PM
Creation date
10/12/2006 12:30:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8021
Description
Section D General Correspondence-Western States Water Counci
State
CO
Date
9/20/1965
Author
Ivan P Head
Title
Development of Western States Water Council
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A <br />~- <br />~ <br /> <br />j <br /> <br />. <br /> <br />, <br />-- <br /> <br />The Governor st:r,~ssed t:',at '''e mus\'. act as fast as we <br />can for if we cannot get tile planning ,:or Wt'S'cwide development <br />moving among the States tnemselves it is goL'e; to be done at a <br />level which may not take into accoun1: the specific interest as <br />we see it. If we cannot v.Qrk togetlw': as cOrriJ.,inec: States we <br />certainly cannot complain if someone (.15e, specifically the <br />Federal Government resolves our probJ.em for us. He stated, "We <br />cannot complain about FedeL'al control. '<Ihen it 1.-; invited by our <br />Own inaction." One repres',ntative or. the Wesceln States Water <br />Council from each of the S',.ates joinE:"': its chair,F,n day before <br />yesterday to establish its budget to lan its heac...luarters and <br />to give consideration to tl8 staff rE<;uired to mak'~ the council <br />the operating organization i.t should [)e. <br /> <br />A budget of about $50,000 for the balance ,.f this fiscal <br />year was approved to provide tor the ~;ervices of a.-, e_'ecutive <br />director and two other profee3ional pCOi)le along .,ith " secretary <br />and a clerk. The budget also provided for offi.ce space, equipment, <br />supplies. etc. The executiv= director 'a compensation wa, set at <br />not to exceed $25,000. '1'hi'. budget ,<,i1J be presented to the full <br />council for approval at a r'c eting to be held in November _ n Denver. <br /> <br />The representati' 0S meeting in Boise, 'I'uesday. wi..1 also <br />reconunend to the full Counul on November 13 the follO\oing p."ogram <br />for the staff the balance cl' the fiscal year: <br /> <br />Ini tially, the staff w _11 be engaged in three concurrent ~ffort.s: <br /> <br />1. The development )f draft statements of criteria and <br />assumptions to }:" applied by H.e Council i.n arriving ,.t <br />its recommendi'ltJ~ms to the Gov'=rnOJ:s. These wiil relot-.e <br />to matters of er'ri1eering fea",ibility, economic fcasibHity, <br />political re!3pOIl3i.)ili ty, leg,ll considerat ion and ethi':al <br />desirability, 'Th., protectiOl\ and furtherance of StatE: <br />and 10cal interc,stu" and such other' factors' as may be <br />relevant. <br /> <br />2. An j,ntensiv3 revi,,.,, and evaluab_on of the plans ami. <br />activities of the States and the J?ede:cal Government in <br />developing C'1rren; and long-rang', estimates of wateI. <br />needs and "_ater 1:~sources in the eleven contiguous <br />Western S'~ates ar d related arear,. The review vlill include: <br /> <br />A. Description of content and time schedule for <br />c0mpletion of I:urrent studLes. <br /> <br />B. Identification of gaps in the information. <br /> <br />C. Suggestion of c:ppropriate 1,leans of correcting the <br />inadequacies of the informacion. <br /> <br />-.1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.