Laserfiche WebLink
<br />.; <br /> <br />OO-,-03~ <br /> <br />. <br /> <br />. <br /> <br />Glen Canyon Unit <br /> <br />The contractor for painting Page City water storage tanks completed this work in <br /> <br />late February. Work continues on installing the hydraulic service elevator in the <br /> <br />powerplant. The hydraulic cylinder has been grouted in place, elevator pit com- <br /> <br />pleted, and handrailing installed. The elevator is being installed and electrical <br /> <br />work is underway. Contract completion is expected this spring. <br /> <br />Navajo Unit <br />Contractor drawings have been approved for the insulated prefabricated metal <br /> <br />shelter to be erected over the fixed wheel gate hoist and control cabinet on the <br /> <br />crest of Navajo Dam. On-site work got underway late in the report period. <br /> <br />Transmission Division <br /> <br />Winter shutdown continued in effect on construction of access roads for servicing <br /> <br />the Vernal-Hayden and Artesia-Rangely transmission lines. <br /> <br />PARTICIPATING PROJECTS <br /> <br />Bostwick Park Project <br />Silver Jack Dam has been completed except for the outlet works and dressing up of <br /> <br />the construction areas 0 The contractor expects to have the outlet works operable <br /> <br />by April and will complete cleanup work after winter snows leave the high elevation <br /> <br />work area. Construction of project laterals continues to be deferred unti I fiscal <br /> <br />years 1973 and 1974. <br /> <br />6 <br /> <br />