My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04512
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:48 PM
Creation date
10/12/2006 12:24:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1984
Title
Monthly Progress Report - Aquatrain Project - September & October 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CO <br />~D <br />';J" <br />,...j <br />c.J <br />C <br /> <br />\ <br /> <br />. <br /> <br />. <br /> <br />FINANCIAL/ECONOMIC ASPECTS <br /> <br />September and October Activities <br /> <br />Meetings continued with potential investors to secure capital to finance the <br />liquid carbon dioxide/coal slurry pipeline's (Western Resource Transport) design <br />and construction. A number of firms are in the process of evaluating the <br />project. <br /> <br />The Business Plan for Western Resource Transport was augmented with a book on <br />conceptual engineering data and a financial plan. <br /> <br />Anticipated November Activities <br /> <br />Followup meeting will be held with potential U.S. investor. <br /> <br />Investment opportunities will be presented to Pacific Rim companies. <br /> <br />ENGINEERING <br /> <br />September and October Activities <br /> <br />Work progressed in the Tulsa and Oenver offices of Aquatrain, Inc. regarding <br />the engineering aspects of Western Resource Transport. Detailed engineering <br />design work will begin in January 1985. <br /> <br />Investigation of the major equipment is being conducted. <br /> <br />Various arrangements of equipment for slurry and separation facilities are being <br />deve loped. <br /> <br />The detail design of the demonstration facility is being performed. <br /> <br />Equipment and instrumentation for the demonstration facilities are being <br />evaluated. <br /> <br />Anticipated November Activities <br /> <br />Refinement and details for Utah and Colorado coal collection system will be <br />developed. The project to be funded wi 11 be selected based on the coal use r' s <br />coal specifications. Wyoming coal will be the less expensive but Utah and <br />Colorado coal are higher quality. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.