My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04512
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:48 PM
Creation date
10/12/2006 12:24:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1984
Title
Monthly Progress Report - Aquatrain Project - September & October 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i'- <br />:J) <br /><..j< <br />~ <br /><:;.::> <br />C) <br /> <br />. <br /> <br />. <br /> <br />ENVIRONMENT <br /> <br />September and October Activities <br /> <br />To accommodate recent changes in the origination point for the liquid carbon <br />dioxide/coal slurry pipeline, a supplement to the Corridor Study must be pre- <br />pared. The supplement will cover the area from Gillette, WYoming, to the south- <br />west corner of the State. A statement of work for this supplement has been <br />prepared. Work on the supplement is on hold pending funding for the slurry <br />pipeline. <br /> <br />Copies of legislation on pipeline right-of-way have been obtained from states to <br />be traversed by the slurry line. These are being evaluated to determine appli- <br />cability of state eminent domain laws to coal slurry pipelines. <br /> <br />Anticipated November Activities <br /> <br />Further environmental activities will be minimal until funding for the slurry <br />pipeline is obtained. <br /> <br />PUBLIC INFORMATION/INVOLVEMENT <br /> <br />September and October Activities <br /> <br />The Oil & Gas Journal announced revised plans for the liquid carbon dioxide/coal <br />slurry pipeline in its September 17 edition. The article is very accurate <br />except for the map showing the pipeline route. Please refer to the full-page <br />map enclosed for the correct route. <br /> <br />An article on the project was prepared for a future issue of Right of Way, the <br />magazine of the International Right of Way Association. <br /> <br />Reclamation and Aquatrain, Inc. representatives spoke to the Price, Utah <br />Chamber of Commerce on October 3 regarding the revised project. <br /> <br />Anticipated November Activities <br /> <br />A public involvement plan will be prepared for actions which are expected to <br />resume in January 1985. <br /> <br />Reclamation representatives will speak on the project to the Ute Chapter of the <br />Colorado Professional Engineers, Grand Junction, Colorado, on November 15, <br />1984. <br /> <br />~d ~- 1 <br />~ c: ~J <br />Acting Project Manager <br /> <br />//-t5'-t9"7" <br /> <br />Date <br /> <br />Enclosure <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.