Laserfiche WebLink
<br />0') <br />~ <br />(;\1 <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />f=.". <br />'~-) <br /> <br />'.-' <br /> <br />ESTIMATED COSTS <br /> <br />Stage Two <br />Construction cost~ <br />Interest during construction <br />Less costs of investigations prior to <br />author izat ion <br />Total <br />Annual equivalent cost <br />Operation, maintenance, and replace- <br />ment cos t <br />Total <br />Salinity reduction at Imperial Dam (mg/L) <br />Cost effectiveness ($/mg/L) <br />Average annual salt reduction (tons) <br />Cost per ton <br />Total Grand Valley Unit <br />Construction cost <br />Interest during construction <br />Less costs of investigations prior to <br />author izat ion <br />Total <br />Annual equivalent cost <br />Operation, maintenance, and replace- <br />ment cost <br />Costs per mg/L of salinity reduction <br />Average annual salt reduction (tons) <br />Cost per ton <br />l! January 1983 prices. <br /> <br />COST ALLOCATION <br /> <br />Stage Two <br />Reimbursable costs . . <br />Nonreimbursable costs. <br />Tot al . . . . . <br />Total Grand Valley Unit . <br />Reimbursable costs . . <br />Nonreimbursable costs. <br /> <br />ANNUAL PAYMENTS REQUIRED (50-year repayment period) <br /> <br />Stage Two <br />Upper Basin. <br />Lower Bas in. <br />Total . <br />Total Grand Valley Unit <br />Upper Basin. <br />Lower Basin. <br />Total . <br /> <br />2 <br /> <br />$l40,7l0,000 <br />3,680,000 <br /> <br />-275,000 <br />144,115,000 <br />8,668,000 <br /> <br />49,000 <br />8,717,000 <br />l4.l <br />6l8,000 <br />l39,700 <br />$62 <br /> <br />169,348,000 <br />4,792,000 <br /> <br />-300,000 <br />l73 ,840 ,000 <br />lO,456,000 <br /> <br />59,000 <br />633,000 <br />l64,300 <br />$64 <br /> <br />$35,l09,000 <br />105,601,000 <br />l40, 710 ,000 <br /> <br />42,262,000 <br />l27,786,000 <br /> <br />$105,000 <br />597,000 <br />702,000 <br /> <br />l27,000 <br />718,000 <br />845,000 <br />