My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04498
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04498
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:43 PM
Creation date
10/12/2006 12:23:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.120
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1983
Title
Supplement To Definite Plan Report: Stage Two Development Grand Valley Unit
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br />~ <br />C\.l <br />o <br />':"-,. <br /> <br />'--~ <br /> <br />SUMMARY SHEETS <br /> <br />Grand Valley Unit Stage Two <br /> <br />LOCATION <br /> <br />The Grand Valley Unit of the Colorado River Basin Salinity Control <br />Project is located in western Mesa County in west-central Colorado. <br /> <br />PURPOSE <br /> <br />The overall purpose of the Grand Valley Unit is to reduce salt loading to <br />the Colorado River. <br /> <br />PLAN <br /> <br />The Stage Two plan of development consists of lS increments and provides <br />for concrete lining about 40 miles of canals and about 300 miles of <br />laterals. Wildlife measures would be included to compensate for losses <br />of wildlife habitat which could be expected to result from the canal and <br />lateral improvements. Cost estimates and financial and economic analyses <br />were based upon January 1983 appraisal-level data. <br /> <br />The first 13 increments consisting of the west end of the Government <br />Highline Canal and all the identified lateral systems in The Stage Two <br />area would be constructed first. A decision about constructing the final <br />two increments--the middle and east portions of the Government Highline <br />Canal--would be deferred until deemed necessary to meet salinity program <br />goals. Because NEPA compliance would be sought on all lS increments, <br />development of the entire plan is scheduled over a l3-year period with <br />construction to begin in fiscal year 1986. <br /> <br />EFFECTS ON THE COLORADO RIVER (average annual) <br /> <br />Decrease in salt load (tons) . . . <br />Reduction in salinity concentration at <br />Imperial Dam (mg/L). . . . . . . <br /> <br />l39,700 <br /> <br />. . . . . . <br /> <br />l4.l <br /> <br />PROJECT FEATURES <br /> <br />Canals to be lined (miles) . <br />Laterals to be lined (miles) <br /> <br />40 <br />300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.