My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04460
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:55:34 PM
Creation date
10/12/2006 12:22:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.980
Description
Colorado River Studies and Investigations - Upper Gunnison/Uncompahgre Basin Water Study
Basin
Gunnison
Water Division
4
Date
11/1/1988
Title
Phase I Feasibility Study for Upper Gunison-Uncompahgre Basin -- Task Memorandum No. 6
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXECUTIVE SUMMARY <br /> <br />'~;l~~~~i;.~ <br /> <br />o <br />"\ <br /> <br />The Upper Gunnison-Uncompahgre Phase I Feasibility Study is being carried <br />out to identify financially feasible, environmentally sound, water resource <br />management and development alternatives within the study area. This study is <br />being carried out at a prefeasibility level of evaluation. The level of <br />effort involved is sufficient to distinguish major differences between <br />a lternat i ves, determi ne the vi abil ity of each a 1 tern at i ve and draw concl us ions <br />regarding whether more refined studies are warranted. This study consists of <br />16 work tasks. This memorandum presents the results of the following five <br />tasks: <br /> <br />""'" <br />c-' <br />f\.) <br />...J <br /> <br />Task No. 7 Select Plan Evaluation/Screening Criteria <br />Task No. B Non-Structural Plan Components <br />Task No. g Structural Plan Components <br />Task No. 10 Formulate and Evaluate Alternative Plan Combinations and <br /> Financing Strategies <br />Task, No. 11 Identify Environmental Impacts and Potential Solutions <br /> <br />This memorandum discusses the formulation, evaluation and ranking of <br />alternative plans which are intended to satisfy projected future demands <br />within the study area. It also presents a discussion of potential dev!!lopment <br />projects which could possibly enhance the financial feasibility of the <br />preferred alternative plan(s) if needed. Environmental impacts and potential <br />mitigation measures associated with each potential plan and financing <br />mechanism are discussed. Finally, various sources of potential project <br />financing and potential project revenues are presented and discussed briefly. <br /> <br />FUTURE WATER DEMANDS <br /> <br />Alternative plan components and alternative plans were <br />future demands that were forecasted in earlier work tasks. <br />di scussed in deta il in previ ous task memoranda and they <br />follows: <br /> <br />identified to meet <br />These demands were <br />are summari zed as <br /> <br />Sol <br /> <br />H L <br />
The URL can be used to link to this page
Your browser does not support the video tag.