Laserfiche WebLink
<br /> <br />~~ <br /> <br />[lECElvm <br /> <br />WIll 2 9 '88 <br />COl.ONADOWA1IR <br />CONSl!RVATfON <br />BOARD <br /> <br />t- <br />..::-> <br />N <br />~ <br /> <br />PHAS.E I FEASIBILITY STUDY FOR <br />UPPER GUNNISON-UNCOMPAHGRE BASIN <br /> <br />TASK MEMORANDUM NO, 6 <br /> <br />TASKS 7, 8, 9, 10 and 11 <br /> <br />Submitted to: <br /> <br /> -- <br />OIR . <br />sc <br />ASC <br />F <br />I <br />L <br />E <br /> <br /> <br />Colorado Water Resources and Power Development Authority <br />1580 Logan Street, Suite 620 <br />Denver, Colorado 80203 <br /> <br />Prepared by: <br /> <br />HDR Engineering, Inc. <br />303 East 17th Avenue, Suite 300 <br />Denver, Colorado 80203 <br /> <br />In association with: <br /> <br />WBLA, Inc. <br />Woodward Clyde Consultants <br />U.S. Bureau of Reclamation <br />C.U. Center for Economic Analysis <br /> <br />November 1988 <br />