My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04336
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:57 PM
Creation date
10/12/2006 12:17:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.122
Description
Paonia Project
State
CO
Basin
Gunnison
Water Division
4
Title
Various Data Tables re: Crop Income
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AVERAGE ANNUAL INCREASE IN CROP INCOME <br />-- <br />AVAILABLE TO PAY PROJECT CONSTRUCTION COSTS <br />ON PER ACRE BASIS <br /> <br />FIRE MOUNTAIN LANDS <br /> <br />Maximum crop income per acre available to pay <br />increased water charges and owner's income <br /> <br />Irrigated Dry <br />Lands Lands <br />$ 2.66 $17.16 <br />0.'59 0.59 <br />0.00 7.97 ' <br />2.07 8.60 <br />7.940 702 <br />$16.43'5 $6.034 <br />$ 898.760 <br /> <br />Estimated project operation and maintenance <br />cost per acre <br /> <br />Owner income frOlll original investment on dry <br />land <br /> <br />Net income available for project ccnstruction <br />repayment per acre <br /> <br />Total acreage to be benefited'in each land area <br /> <br />Total annual income available for construction <br />repayment <br /> <br />Total i.ncome available for construction repay- <br />ment in 40 years <br /> <br />OVERLAND LANDS <br /> <br />Maximum crop income per acre available to pay <br />increased water charges and owner's income <br /> <br />$ 0.68 $11.29 <br /> <br />Estimated project operation and maintenance <br />cost per acre <br /> <br />0'47 0.47 <br /> <br />Owner income frcm original investment cn dry <br />land <br /> <br />0.00 4.'58 <br /> <br />Net income available for project construction <br />repayment per acre <br /> <br />Total acreage to be benefited in each land area <br /> <br />0.21 6.24 <br />4.807 1.307 <br /> <br />Total annual inccme available for construction <br />repayment <br /> <br />$1.009 $8.162 <br /> <br />Total inoome available for construction repay. <br />ment in 40 years <br /> <br />COMBINED REPAYMENT - 40 years <br /> <br />$ 366.840 <br />$1.26'5.600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.