Laserfiche WebLink
<br />COST OF PROJECT WATER <br /> <br />PER ACRE FOOT <br /> <br />FIRE MOUNTAIN LANDS <br /> <br />Participating acreage <br /> <br />Water Supply to be furnished by project (AF) <br />Project water to dry lands (4.5Al'/A) <br />Remaining project water to irrigated lands (l.2AF/A) <br /> <br />Annual repayment for construotion as evaluated from <br />increase in crop income <br /> <br />Cost of project water per acre foot <br /> <br />OVER!.Al\ D LAliDS <br /> <br />Participating acreage <br /> <br />Water Supply to be furnished by project (AF) <br />Project water to dry lands (2.8 A:F/A) <br /> <br />Remaining project water to irrigated lands (0.22AF/A) <br /> <br />Annual repayment for construction as evaluated from <br />inorease in orop inoome <br /> <br />Cost of projeot water per acre foot <br /> <br />Irrigated <br />Le.nd s <br /> <br />7.940 <br /> <br />9.841 <br /> <br />.16,435 <br />$1.67 <br /> <br />4.807 <br /> <br />1.040 <br /> <br />$1.009 <br /> <br />$0.97 <br /> <br />Dry <br />Lands <br /> <br />702 <br /> <br />3.159 <br /> <br />$6.03l1 <br /> <br />$1.91 <br /> <br />1.307 <br /> <br />3.660 <br /> <br />$8 .162 <br />$2.23 <br /> <br />Total <br /> <br />8.642 <br /> <br />13.000 <br /> <br />$22.M9 <br /> <br />t1. 73 <br /> <br />6.114 <br />4.700 <br /> <br />$9.171 <br /> <br />$1.95 <br /> <br />i <br />, <br />