Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />e <br /> <br />000196 <br /> <br />67D Clear Creek <br />QP at sec 15 - 12S - 80W; 100 feet upstream of the most upstream forest boundary <br />Amount: A CWCB instream flow of 15 cfs year round is acceptable at the QP, In <br />addition, USFS requests a high flow between May 1 and July 15 of at least 70% of <br />bankfull and upto 120 % of bankfull to move sands in stream. Group wanted more <br />definition (limits) on the high flow request and assurance that there would be some <br />upstream exchange potential particularly during runoff to accommodate existing and <br />future development in the basin, <br /> <br />7lA North Cottonwood Creek <br />QP at sec 9 - 14S - 79W; 100 feet upstream of the east section line (forest boundary) <br />Amount: 7 cfs year round which is same as CWCB instream flow, <br /> <br />7lB Cottonwood Creek <br />Deleted, split into South and Middle Cottonwood QP's. <br /> <br />7lB.I Middle Cottonwood Creek <br />New QP at sec 24 - 14S - 80W; just above confluence with Huges Creek <br />Amount: A CWCB instream flow of 10 cfs year round is acceptable at the QP, In <br />addition, USFS requests a high flow between May 15 and July 15 of at least 70% of <br />bankfull and upto 120 % of bankfull to move sands in stream, Group wanted more <br />definition (limits) on the high flow request and assurance that there would be some <br />upstream exchange potential particularly during runoff. <br /> <br />71B.2 Sonth Cottonwood Creek <br />New QP at sec 2 - 15S - 80W; 100 feet upstream of the north section line <br />Amount: A CWCB instream flow of 10 cfs year round is acceptable at the QP, In <br />addition, USFS requests a high flow between May 15 and July 15 of at least 70% of <br />bankfull and upto 120 % of bankfull to move sands in stream, Group wanted more <br />definition (limits) on the high flow request and assurance that there would be some <br />upstream exchange potential particularly during runoff. <br /> <br />7SA Chalk Creek (2 alternatives discnssed to cnrrent QP) <br /> <br />7SA.I Chalk Creek - alternative I <br />New QP at sec 32 - 15S - 80W; NF Chalk Creek 100 feet upstream of private inholding <br />New QP at sec 12 - 51N - 5E; Chalk Creek 100 feet upstream of east section line <br />New QP at sec 30 - 15S - 79W; Baldwin Creek at County Road 162 <br />Amount on NF Chalk Creek: 8 cfs year round which is same as CWCB instream flow, In <br />addition, USFS requests a high flow between May IS and July 15 of at least 70% of <br />bankfull and upto 120 % of bankfull to move sands in stream, Group wanted more <br />definition (limits) on the high flow request and assurance that there would be some <br />upstream exchange potential particularly during runoff. <br />Amount on Chalk Creek above St Elmo: A CWCB instream flow recommendation needs <br />to be made and would likely be deemed acceptable, In addition, USFS requests a high <br />flow between May 15 and July 15 of at least 70% of bankfull and upto 120 % of bankfull <br />to move sands in stream, Group wanted more definition (limits) on the high flow request <br />and assurance that there would be some upstream exchange potential particularly during <br />runoff. <br /> <br />5 <br /> <br />~",a <br />