My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04202
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:13 PM
Creation date
10/12/2006 12:12:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
3/10/1997
Author
D Randolph Seaholm
Title
Technical Workgroup - Group 1 Stream Summary - March 10 1997
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />, <br /> <br />e <br /> <br />UUUl:J1 <br /> <br />Amount on Baldwin Creek: A CWCB instream flow recommendation needs to be made <br />and would likely be deemed acceptable. <br /> <br />75A.l Chalk Creek. alternative 2 <br />New QP at sec 26 - 15S - 80W; Chalk Creek 100 feet upstream of private inholdings <br />upstream of Alpine Lake (Fehlings Reservoir) <br />Amount on Chalk Creek above Alpine: 18 cfs year round which is same as CWCB <br />instream flow, In addition, USFS requests a high flow between May 15 and July 15 of at <br />least 70% of bankfull and upto 120 % of bankfull to move sands in stream. Group <br />wanted more definition (limits) on the high flow request and assurance that there would <br />be some upstream exchange potential particularly during runoff for existing and future <br />development <br /> <br />79A North Fork South Arkansas <br />QP at sec 17 - 50N - 7E; Angel of Shavano Campground below McCoy Creek <br />Amount: 10 cfs year round which is same as CWCB instream flow, <br /> <br />79C Cree Creek <br />New QP at sec 31 - 50N - 7E; 100 yards above the Silver Creek Station Diversion <br />Amount: Sept 1 to Nov, 14 - 1 cfs, Nov. 15 to ApT. 30 - ,5 cfs, May 1 to Aug, 30 - 2.5 <br />cfs, These are the same as the proposed CWCB instream flows, <br /> <br />79D Fooses Creek <br />QP at sec 36 - 50N - 6E; Approximately .25 miles above Public Service Co, Reservoir or <br />Fooses Lake <br />Amount: Oct. 15 to Apr, 30 - 1.75 cfs, May 1 to Oct. 14 - 5.5 cfs, These are the same as <br />the proposed CWCB in stream flows, <br /> <br />79E Middle Fork South Arkansas <br />QP at sec 28 - 50N - 6E; Just upstream of confluence with tributary from Boss Lake <br />Amount: 5 cfs year round which is same as CWCB instream flow, <br /> <br />79F South Arkansas River <br />QP at sec 5 - 49N - 6E; at Monarch Park Campground road <br />Amount: A CWCB instream flow recommendation needs to be made at a point just <br />above the small tributary coming in from Monarch Ski Area, The QP was left in its <br />original location and not moved upstream coincide however, The intent was to keep the <br />reach length protected as long as possible and quantify without considering any inflow <br />from the Monarch Ski Area tributary, This approach was intended to eliminate the <br />potential of ever needing to call out the Monarch Ski Area during ski season, In <br />addition, USFS requests a high flow between May 1 and July 15 of at least 70% of <br />bankfull and upto 120 % of bankfull to move sand in the stream as a result of sanding <br />Monarch Pass, Group was okay with this approach, <br /> <br />79J Poncha Creek <br />QP at sec 7 - 48N - 8E; at south section line near Shirley town site <br />Amount: 8 cfs year round which is same as CWCB instream flow, <br /> <br />83B <br /> <br />Porter Gulch (USFS will drop all claims) <br /> <br />6 <br /> <br />,j; '-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.