My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04202
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:54:13 PM
Creation date
10/12/2006 12:12:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
3/10/1997
Author
D Randolph Seaholm
Title
Technical Workgroup - Group 1 Stream Summary - March 10 1997
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />I <br /> <br />e <br /> <br />000195 <br /> <br />63C Twobit Gulch <br />New QP at sec I - lIS - 80W; 100 yards above private inholdings <br />Amount: 2 cfs year round which is same as CWCB instream flow, <br /> <br />65D Black Cloud Creek <br />QP at sec 27 - lIS - 81 W; on north section line <br />Amount: 2 cfs year round which is same as CWCB instream flow, <br /> <br />65E Crystal Lake Creek <br />QP at sec 28 - lIS - 81W; 100 feet above private inholdings and just below Wilderness <br />Boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely be <br />deemed acceptable, <br /> <br />65F Echo Creek <br />QP at sec 20 - II S - 81 W; 100 feet above the USFS Boundary near Lake Ck confluence <br />Amount: 2 cfs year round which is same as CWCB instream flow, <br /> <br />65G La Plata Gulch <br />QP at sec 30 - lIS - 81 W; 100 feet above private inholding boundary <br />Amount: A CWCB instream flow recommendation needs to be made and would likely be <br />deemed acceptable. <br /> <br />65H South Fork Lake Creek <br />QP at sec 35 - lIS - 82W; 100 feet upstream of the private lands <br />Amount: 8 cfs year round which is same as CWCB instream flow, <br /> <br />651 North Fork Lake Creek <br />New QP at sec 22 - lIS - 82W; 100 feet upstream of the Twin Lakes Tunnel <br />Amount: A CWCB instream flow of 10 cfs year round is acceptable, This instream flow <br />extends from the headwaters to the confluence with the South Fork. CDOW should <br />validate the recommendation at the QP, The QP is considerably upstream of the South <br />Fork confluence and inflows from Twin Lakes Tunnel transmountain diversion, In <br />addition, USFS requests a high flow between May I and July IS of at least 70% of <br />bankfull and upto 120 % of bankfull to move sands in the stream as a result of sanding <br />Independence Pass (?), Group wanted more definition (limits) on the high flow request <br />and assurance that there would be some upstream exchange potential particularly during <br />runoff <br /> <br />67 A Low Pass Gulch <br />QP at sec 28 - lIS - 79W; 100 feet upstream of the west section line (forest boundary) <br />Amount: 2 cfs year round which is same as CWCB instream flow, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.