My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04129
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:53 PM
Creation date
10/12/2006 12:10:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1959
Author
Unknown
Title
Quarterly Reports 1959
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. Rrnt~yf'O <br />NOV:; 0 tl59 <br /> <br />co;', ""R <br />IllJ.lSr":fr. ~'~JAU <br />, " <br /> <br />\\O'i)il41 <br /> <br />QUARTERLY REPORT FOR REGION 4, BUREAU OF RECLAMATION <br />.w, TO PAciF"f1:rSoU'tHW'EST-rNtER-AGENCYCOMMIT'rnlj:--- <br />--.- J?ECEMBER' 2, !95~ - <br /> <br />lII~IgllTS: Continued good progress was recorded on the <br /> <br /> <br />Region 4 construction program, except at the Glen Canyon damsite where <br /> <br />the strike still has work halted, Construction of Vega Dam on the <br /> <br />Gollbran Project (Colorado) was comple~ed in September. Appropriated <br />funds were allocated for three new participating project starts so <br /> <br />that construction contracts can be awarded in F.Y. 1960, Planning <br /> <br />studies proceed with several project reports completed or well advanced, <br /> <br />A number of meetings have been held with representatives of private <br />I <br />power companies and preference power users regarding the technical <br /> <br />aspects of possible plans for a transmission system to handle the <br /> <br />future power output from the hydroelectric powerplants of the <br /> <br />storage units and participating projects, <br /> <br />.~GE UNI.TI!: At the .'?l!!!Canyon D.!!!:!.site, a stalemate <br />still prevails in the strike which has shut down all work since July 6. <br /> <br />The dispute centers on the payment of $6.00 per day subsistence to <br /> <br />the workers. Under the terms of the prime construction contract with <br /> <br />Merritt-Chapman and Scott Corporation, the Bureau of Reclamation will <br /> <br />pay 85 percent of bonafide wage increases, but cannot assist in the <br /> <br />payment of subsistence. The circumstances surrounding the strike <br /> <br />dispute are complex. Although the Bureau would like to see an early <br /> <br />resumption of work, it is the responsibility of the prime contractor <br /> <br />to reach a settlement with the labor ~nions in this dispute. <br /> <br />,--<-j, <br /> <br />, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.