Laserfiche WebLink
<br />3828 <br /> <br />~ " <br /> <br />21) MET R 0 POL I TAN W ATE R D 1ST R [ C T <br /> <br />TABLE 15 <br />IlISTRIHUTION SYSTEM FEATURES <br /> <br />June 30. 1961 <br /> <br />COMPLETED <br />DISTANCE <br /> <br />FEATURES <br /> <br />Right of way, lands and eascment:,;... <br />Mathews dam, dike and head works.. <br /> <br />Pjpelin~'s : <br /> <br />Precast concrete <br />COJlcl'etp, cast-ill~p]ace ... <br />Asbt;'~tos cement <br />W deled stet:'l . <br />Cast iron. .... <br />Appurtenant w(,rks . <br />Cn nal~. concrete Ii net! <br />Tunnels . <br />Reservoirs <br />Softening' Plant nm ....m <br />L.A. Office Headquarters Building- . <br />Pomona Valley l\IWD faciliti(~s.. <br />Eastern M\VD f:lcilities . <br />Chino Basin M\VD facilities <br />Testing, preliminar;..-' wOl'k~, undistributed items.. <br />Collectihles and Jlrr~limillary engineering'.. <br /> <br />144.20 mi. <br />o,:n mi. <br />2.44 mi, <br />....175.:~8 mi. <br />10.1:3 mi. <br /> <br />] 5.0.:1 mi. <br />In,18 mi, <br /> <br />Totals <br />Grand Total <br /> <br />DEDUCTIONS: <br />Salvage sale~ . <br />Cash discounts and unredeemed dt'lllands <br />Unapplied insurance re~ervc <br />Liquidated damages. <br />Disposal of permanent works <br />Contributions toward construction.. <br /> <br />Grand Total deduction. <br />Net cost to June :W, 1$'111.. <br /> <br />Add: <br /> <br />Estimated cost of the northerl\' aG.:J miles <br />of First SaIl Diego Aqucdtld (2 barrels)., <br /> <br />COST OF <br />en)I.J P LETEO <br />FEATURES <br /> <br />COST TO <br />DATE OF <br />U NCOM PLETED <br />FEATURE~ <br /> <br />$ :3,847,453 $ 1,428,G78 <br />15,497,SSG 49,1341 <br /> <br />4H,387,071 <br />:381,S07 <br />92.462 <br />T\5Ul,974 <br />~)G4,862 <br />1,P23,587 <br />5,5PO,058 <br />10,075,xSO <br />11,:158,500 <br />7,404,3P8 <br />275,000 <br />:J25,000 <br />3GO,000 <br />496,t)10 55,96:1 <br />514,408 <br />$181,471.888 $10,074,147 <br />$191,54G,035 <br /> <br />2,12.3..974 <br /> <br />70,774 <br />5,583,944 <br />2413,7()5 <br /> <br />$ 24.680 <br />fW.7D9 <br />14,231 <br />124,4:~0 <br />87,811 <br />2,355.fl42 <br />-~ <br />$ 2.07:3 .SO,) <br />.... ...$188.872,2:12 <br /> <br />. <br /> <br />..$ 15,479,449 <br /> <br />1 <br /> <br />water treatment plant. The Orange County and Middle Feeders <br />originate at the Upper Feede,' near La Verne, the l-mile long San <br />Marino Lateral takes off in East Pasadena, and the Palos Verdes <br />[,nd Santa Monica Feeders and the Eagle Rock Lateral take off <br />from the west end of the Upper Feeder at the Eagle Rock Control <br />Tower. <br /> <br />( <br /> <br />Orll-1/[JC Comdy Feeder <br /> <br />The Orange County Feeder delivers softened and filtered water <br />from the softening amI filtration plant at La Verne, It branches off <br />the Upper Feed"" near La Verne and extends 40 miles southerly to <br />